Inspections for the day of: Monday, September 17, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00565 INSP-Alarm Testing9/14/20079/17/20079/17/2007 4:37:55 PMADONE
See the city approved plans for devices tested on the first floor. Plans will need to be resubmitted due to ceiling mount a/v's are now wall mount. The location of dampers are not shown. The second and third floor sprinkler devices are not shown. First floor room numbers have been changed. Device addresses have been changed and addressable modules added.
BLD07-01193 FIRE-Final Inspection9/14/20079/17/20079/17/2007 4:04:14 PMPPASS
life safety passed.
FIR07-00789 INSP-Sprinkler Rough-in9/17/20079/17/20079/17/2007 3:57:35 PMPPASS
Sprinkler pipin is ok to cover but the hangers will need to be attached to the top of the structure and will be checked at the final.
FIR07-00609 INSP-Sprinkler Rough-in9/17/20079/17/20079/17/2007 3:54:56 PMPPASS
The sprinkler piping is ok to cover but the fitter needs to add two addition hangers on two armovers that exceed 2' in overall lenght. They will be checked at the final.
FIR07-00756 INSP-Sprinkler Rough-in/Hydro9/17/20079/17/20079/17/2007 3:51:54 PMPFAIL
The underground supply at the 90 degree fitting is still too shallow and will need to be lowered and reverified at inspection. I gave the ok to cover on the remaining straight run to the United Water tap.
FIR06-00958 INSP-Final Inspection9/17/20079/17/20079/17/2007 3:48:35 PMPFAIL
Inspection was for the blocked pendant heads. I found more heads in the first location I looked on the third floor so I ended the inspection
FIR07-00534 INSP-Final Inspection9/17/20079/17/20079/17/2007 3:46:04 PMPFAIL
The domestic bypass valve is not installed yet. The underground supply has not been flushed yet. The riser needs mounted to the wall. Adequate pipe stands need to be supplied at the riser. Pendant sprinkler heads are blocked by ceiling fans and light fixtures.Project is not ready for a final.
FIR07-00130 INSP-Final Inspection9/14/20079/17/20079/17/2007 3:39:27 PMAFAIL
Need the forward flush performed. I need verification that the relocation of the fire dept. connection is approved. Need caps on the fdc. Need to walk through all of the rooms to look for obstructions, light fixtures, prior to final
BLD05-00633 FIRE-Final Inspection9/17/20079/17/20079/17/2007 2:06:52 PMPCANC
The project related fire alarm and fire sprinkler are not passed yet.
MIS07-00144 FIR-Final9/10/20079/17/20079/17/2007 12:16:22 PMAPASS
Life safety passed
BLD07-01710 FIRE-Final Inspection9/17/20079/17/20079/17/2007 11:17:42 AMAPASS
life safety passed
FIR07-00555 INSP-Final Inspection9/14/20079/17/20079/17/2007 11:16:31 AMAPASS
permit finaled
FIR06-00811 INSP-Alarm Testing9/17/20079/17/20079/17/2007 11:15:57 AMAFAIL
The dialer was in trouble and would not clear. No test performed.