FIR07-00565
| INSP-Alarm Testing | 9/14/2007 | 9/17/2007 | 9/17/2007 4:37:55 PM | A | DONE |
|
|
See the city approved plans for devices tested on the first floor. Plans will need to be resubmitted due to ceiling mount a/v's are now wall mount. The location of dampers are not shown. The second and third floor sprinkler devices are not shown. First floor room numbers have been changed. Device addresses have been changed and addressable modules added.
|
BLD07-01193
| FIRE-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 4:04:14 PM | P | PASS |
|
|
life safety passed.
|
FIR07-00789
| INSP-Sprinkler Rough-in | 9/17/2007 | 9/17/2007 | 9/17/2007 3:57:35 PM | P | PASS |
|
|
Sprinkler pipin is ok to cover but the hangers will need to be attached to the top of the structure and will be checked at the final.
|
FIR07-00609
| INSP-Sprinkler Rough-in | 9/17/2007 | 9/17/2007 | 9/17/2007 3:54:56 PM | P | PASS |
|
|
The sprinkler piping is ok to cover but the fitter needs to add two addition hangers on two armovers that exceed 2' in overall lenght. They will be checked at the final.
|
FIR07-00756
| INSP-Sprinkler Rough-in/Hydro | 9/17/2007 | 9/17/2007 | 9/17/2007 3:51:54 PM | P | FAIL |
|
|
The underground supply at the 90 degree fitting is still too shallow and will need to be lowered and reverified at inspection. I gave the ok to cover on the remaining straight run to the United Water tap.
|
FIR06-00958
| INSP-Final Inspection | 9/17/2007 | 9/17/2007 | 9/17/2007 3:48:35 PM | P | FAIL |
|
|
Inspection was for the blocked pendant heads. I found more heads in the first location I looked on the third floor so I ended the inspection
|
FIR07-00534
| INSP-Final Inspection | 9/17/2007 | 9/17/2007 | 9/17/2007 3:46:04 PM | P | FAIL |
|
|
The domestic bypass valve is not installed yet. The underground supply has not been flushed yet. The riser needs mounted to the wall. Adequate pipe stands need to be supplied at the riser. Pendant sprinkler heads are blocked by ceiling fans and light fixtures.Project is not ready for a final.
|
FIR07-00130
| INSP-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 3:39:27 PM | A | FAIL |
|
|
Need the forward flush performed. I need verification that the relocation of the fire dept. connection is approved. Need caps on the fdc. Need to walk through all of the rooms to look for obstructions, light fixtures, prior to final
|
BLD05-00633
| FIRE-Final Inspection | 9/17/2007 | 9/17/2007 | 9/17/2007 2:06:52 PM | P | CANC |
|
|
The project related fire alarm and fire sprinkler are not passed yet.
|
MIS07-00144
| FIR-Final | 9/10/2007 | 9/17/2007 | 9/17/2007 12:16:22 PM | A | PASS |
|
|
Life safety passed
|
BLD07-01710
| FIRE-Final Inspection | 9/17/2007 | 9/17/2007 | 9/17/2007 11:17:42 AM | A | PASS |
|
|
life safety passed
|
FIR07-00555
| INSP-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 11:16:31 AM | A | PASS |
|
|
permit finaled
|
FIR06-00811
| INSP-Alarm Testing | 9/17/2007 | 9/17/2007 | 9/17/2007 11:15:57 AM | A | FAIL |
|
|
The dialer was in trouble and would not clear. No test performed.
|