Inspections for the day of: Wednesday, September 17, 2008.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-02501 Conference9/10/20089/17/20089/17/2008 4:01:50 PMPDONE
Ed-Please call at least a half hour prior to inspection Phone #: ###-#### talked about service change requirements, grounding, bring up to code, work space, when to call for inspection
ESC08-00346 General Inspection9/17/20089/17/20089/17/2008 3:30:18 PMPPART
looked ok
ESC08-00084 General Inspection9/17/20089/17/20089/17/2008 3:29:34 PMPPART
looked ok
ESC07-01432 General Inspection9/17/20089/17/20089/17/2008 3:28:48 PMPPART
looked ok
ESC08-00411 General Inspection9/17/20089/17/20089/17/2008 3:27:52 PMAPART
looked ok
ELE08-02546 Electrical Rough-In9/16/20089/17/20089/17/2008 3:26:45 PMAPASS
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ric ok, could not add esc comments
ELE08-01064 Final9/16/20089/17/20089/17/2008 3:25:20 PMAPASS
Neil Phone #: ###-#### corrections made, ok to final, could not add esc comments
ESC07-00071 General Inspection9/17/20089/17/20089/17/2008 3:23:58 PMAPART
looked ok
ESC08-00549 General Inspection9/17/20089/17/20089/17/2008 3:22:59 PMAPART
looked ok
ELE08-02163 Final9/17/20089/17/20089/17/2008 3:22:06 PMPPASS
danny Phone #: ###-#### ok to final
ELE08-02533 Electrical Rough-In9/17/20089/17/20089/17/2008 3:05:43 PMPPASS
Requesting an inspection to cover ground work. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty correction made, left sticker u/g ok to cover, wall also ok to cover
ELE08-01563 Electrical Rough-In9/17/20089/17/20089/17/2008 2:14:17 PMPPASS
Jason- wall Phone #: ###-#### elevator wall and closet anop ok to cover
ELE08-02423 Electrical Rough-In9/17/20089/17/20089/17/2008 1:00:18 PMPPASS
JASON Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 1st floor north 4 units anop ok to cover
ELE08-02486 Rough-In Permanent Service9/16/20089/17/20089/17/2008 11:46:03 AMACANC
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot see ri , called contractor
ELE08-02486 Electrical Rough-In9/17/20089/17/20089/17/2008 11:37:19 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot called contractor, ri ok, will need to call for p/s when accessible on outside of building at meter
ELE08-02544 Final9/16/20089/17/20089/17/2008 10:45:36 AMAPASS
Mike Phone #: ###-#### ok to final, no esc this project
ELE08-02505 Final9/16/20089/17/20089/17/2008 10:18:45 AMACANC
james Note: please call 1/2 hr prior to inspection for access Phone #: ###-#### wrong type request, see p/s
ELE08-02505 Permanent Service9/17/20089/17/20089/17/2008 10:15:17 AMAPASS
james Note: please call 1/2 hr prior to inspection for access Phone #: ###-#### called contractor to change gec abrasion protection to plastic,strap conduit, address work space, p/s o/h rec ok, no esc this project
ELE08-02370 Electrical Rough-In9/16/20089/17/20089/17/2008 9:29:04 AMAPASS
Electrical Underground inspection.

Call for more information. Phone #: ###-#### Internet Inspection Request from: Donovan Waldenmyer looked at u/g power for ipco, told we don't inspect utility side, looked at 4" comm, said ok to cover
ELE08-02543 Electrical Rough-In9/16/20089/17/20089/17/2008 8:58:42 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Jenni Keller ric ok, no esc this project
ELE08-02543 Final9/17/20089/17/20089/17/2008 8:58:06 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Jenni Keller ok to final, no esc this project
ELE08-02533 Electrical Rough-In9/16/20089/17/20089/17/2008 8:49:03 AMAFAIL
Requesting an inspection to cover ground work. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty met electrician, NEC 300.5 conduit shall be spaced u/g , no esc this project
ELE07-02451 Final9/16/20089/17/20089/17/2008 8:08:20 AMAPASS
Final inspection on Phase 2 Light Poles. Building was partially finaled contingent upon Light poles being completed. Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson corrections made, lights done at phase 2, ok to final, signed occupancy card