BLD08-01188
| FIRE-Final Inspection | 9/17/2008 | 9/17/2008 | 9/18/2008 1:56:53 PM | P | PASS |
|
|
C/N is completed with the exception of the landing at the south exit-to be finished prior to structural final, hardware at the interveining door changed to passage, life safety passed.
|
FIR08-00598
| INSP-Final Inspection | 9/16/2008 | 9/17/2008 | 9/17/2008 5:04:36 PM | P | FAIL |
|
|
Horn/strobes in portable class room were not in-sync, also tested tampers, flow switches, smoke detectors and pull stations in main building do to the replacement of mother board in existing panel. Annuciator at main entrance did not function correctly and will need to be repair before permit is finaled.See (NFPA, 2007, 10.4.1.2 )for testing requirments. KR
|
FIR07-00660
| INSP-Final Inspection | 9/17/2008 | 9/17/2008 | 9/17/2008 4:00:53 PM | P | PASS |
|
|
Fire alarm permit passed final inspection per activities completed 8/22/07, permit finaled.
|
BLD07-02689
| FIRE-Final Inspection | 9/16/2008 | 9/17/2008 | 9/17/2008 3:58:39 PM | P | PASS |
|
|
Locking hardware at the office slider doors has been removed, fire life safety finaled.
|
FIR08-00517
| INSP-Sprinkler Rough-in/Hydro | 9/17/2008 | 9/17/2008 | 9/17/2008 3:57:32 PM | P | FAIL |
|
|
5th floor overhead cover is not approved at this time due to painted upright heads at several locations, noted one missing head and one overspaced head at the 6th floor-see plans for locations.
|
FIR08-00261
| INSP-Final Inspection | 9/16/2008 | 9/17/2008 | 9/17/2008 1:44:57 PM | A | PASS |
|
|
Field testing completed in conjunction with FIR08-00260, inspection passed. Permit finaled.
|
FIR08-00516
| INSP-Sprinkler Rough-in/Hydro | 9/16/2008 | 9/17/2008 | 9/17/2008 1:41:37 PM | A | PART |
|
|
Overhead hydrostatic testing passed inspection, noted FDC is obstructed as installed by adjacent bollard at the garage door entrance. Need approved plans for rough-in inspection.
|