Inspections for the day of: Thursday, September 17, 2009.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-01744 Rough-In Permanent Service9/17/20099/17/20099/18/2009 9:12:26 AMAPASS
Around 10 if you can. Phone #: ###-#### Internet Inspection Request from: Brandon Blackham ric ok, p/s u/g n ok, NOTE: met contractor, told to call for u/g inspection fron house to garage and to post addresses, told to change room count and add service
ELE09-01354 Final9/17/20099/17/20099/17/2009 3:53:04 PMPCANC
Jared Phone #: ###-#### done in am 9-17-09
ESC09-00332 General Inspection9/17/20099/17/20099/17/2009 3:52:11 PMPPASS
looked ok
ESC09-00530 General Inspection9/17/20099/17/20099/17/2009 3:35:41 PMPPASS
looked ok
ESC09-00342 General Inspection9/17/20099/17/20099/17/2009 3:35:00 PMPPART
looked ok in front, no access to back due to dogs
ESC09-00468 General Inspection9/17/20099/17/20099/17/2009 3:33:57 PMPPASS
looked ok
ELE09-01554 Final9/17/20099/17/20099/17/2009 3:33:11 PMPFAIL
dan - please call for access Phone #: ###-#### called contractor, told that he needs to fix life safety items before final- such as dead front for electrical panel, to call back when job is cleaned up, no esc this project
ELE09-01523 Final9/17/20099/17/20099/17/2009 3:14:11 PMPPASS
Requesting Electrical Final of kitchen remodel Phone #: ###-#### Internet Inspection Request from: Tim Lawrence ok to final, no esc this project
ELE09-01769 Permanent Service9/17/20099/17/20099/17/2009 2:39:04 PMPFAIL
Phone #: ###-#### callec contractor, explained that for service turn on they have to bring up to code, and that they have to get ready before inspection such as cut sticker bush so can look at service, grounding must be brought up to code no esc this project
ELE08-03233 Final9/16/20099/17/20099/17/2009 1:47:12 PMPFAIL
This will be a final inspection please, Contact is Dennis. Thank you for everything and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw met contractor and 412 for inspection with 370, left correction notice,NEC 200.2(B) grounded conductor shall not depend on a connection to a metallic enclosure for continuity, 250.119(A) (1) shall identify grounding conductors for equipment, 312.5 shall provide abrasion protection for all conductors entering enclosures, no esc this project
ELE09-01722 Permanent Service9/16/20099/17/20099/17/2009 10:47:14 AMANH
Phone #: ###-#### Internet Inspection Request from: Lloyd Looney dogs in yard, called, left message, fee due
ELE09-01763 Electrical Rough-In9/17/20099/17/20099/17/2009 10:05:34 AMAPASS
Back door to bedroom unlocked please go through back gate and follow plywood, if you need someone there please call me at ###-#### half an hour before inspection. Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman ric ok, no esc this project
ELE09-01354 Final9/17/20099/17/20099/17/2009 9:33:52 AMAPASS
corrections made, ok to final, no card to sign
ELE09-01193 Final9/16/20099/17/20099/17/2009 9:08:54 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Dave Friend ok to final, no esc this project
ELE09-01756 Electrical Rough-In9/16/20099/17/20099/17/2009 8:41:14 AMAPART
Bud Phone #: ###-#### ok to cover walls only in dressing room only, no green sticker posted, no esc this project
ELE09-01741 Electrical Rough-In9/16/20099/17/20099/17/2009 8:05:58 AMAPASS
Jared ###-#### first thing in am ric ok