ESC10-00504
| General Inspection | 9/16/2010 | 9/17/2010 | 9/17/2010 3:33:48 PM | P | PART |
|
|
Sign has been removed. Re-vegetation has not been watered since the ground has been mulched and seeded. Barriers remain in place, will re-inspect in two weeks.
|
ESC10-00673
| Site Preparation | 9/10/2010 | 9/17/2010 | 9/17/2010 3:13:45 PM | A | NR |
|
|
Legal issues are being worked out.
|
ESC10-00643
| General Inspection | 9/16/2010 | 9/17/2010 | 9/17/2010 2:28:44 PM | P | PASS |
|
|
Progress with restablizing the slope. Talked to RP (Adam) regarding the final restoration including the access road, high rate of mulch, tackifier and upland seed mix on material that will produce re-vegetation. Also, install sediment barriers which will be left in place to reduce velocity of runoff until the site is completely revegetated. Will re-inspect in one week.
|