BLD12-01196
| FIRE-Sprinkler Rough-in | 9/17/2012 | 9/17/2012 | 9/17/2012 4:35:18 PM | P | PART |
|
|
Fire sprinkler work ready for final.
|
FIR12-00384
| INSP-Sprinkler Rough-in/Hydro | 9/17/2012 | 9/17/2012 | 9/17/2012 4:32:11 PM | P | PASS |
|
|
Rough-in work finished and passed inspection. Previous correction items are complete.
|
BLD12-02006
| FIRE-Final Inspection | 9/17/2012 | 9/17/2012 | 9/17/2012 4:30:28 PM | P | NR |
|
|
|
FIR12-00514
| INSP-Sprinkler Rough-in | 9/17/2012 | 9/17/2012 | 9/17/2012 4:30:06 PM | P | PART |
|
|
Overhead fire sprinkler modifications as marked on approved plans are okay for ceiling cover.
|
FIR12-00491
| INSP-Alarm Testing | 9/17/2012 | 9/17/2012 | 9/17/2012 1:39:00 PM | A | PART |
|
|
New system detectors passed on site functional testing.
|
FIR12-00451
| INSP-Sprinkler Rough-in | 9/17/2012 | 9/17/2012 | 9/17/2012 1:35:23 PM | A | PART |
|
|
Branchline piping to SW heads at the storefront canopy okayed for cover.
|
BLD12-02273
| FIRE-Final Inspection | 9/12/2012 | 9/17/2012 | 9/17/2012 1:33:27 PM | A | PASS |
|
|
Fire life safety final approved. Inspection passed.
|
FIR12-00507
| INSP-Final Inspection | 9/13/2012 | 9/17/2012 | 9/17/2012 1:32:31 PM | A | PASS |
|
|
Scope of fire sprinkler work passed both rough-in and final inspections.
|