FIR11-00078
| FIR-Aging Inspection | 9/17/2012 | 9/17/2012 | 9/18/2012 11:04:05 AM | | NR |
|
|
I left message for Jim at Radix requesting job status as per the job history that I can access and the need to get the project finaled.
|
FIR12-00477
| INSP-Sprinkler Rough-in | 9/14/2012 | 9/17/2012 | 9/18/2012 10:08:44 AM | P | PASS |
|
|
The cover inspection on the underground installation is passed. Piping can be covered.
|
BLD12-02409
| FIRE-Final Inspection | 9/17/2012 | 9/17/2012 | 9/17/2012 3:03:37 PM | P | FAIL |
|
|
Provide annual inspection for the fire extinguisher in the lobby and repair the emergency light in the tenant space.
|
FIR12-00362
| INSP-Conference | 9/14/2012 | 9/17/2012 | 9/17/2012 2:14:37 PM | A | DONE |
|
|
Stopped at job site to see if the last office had been provided with sprinkler protection and to verify that the existing upright coverage was quick responce sprinklers, which they were.
|
FIR12-00326
| INSP-Final Inspection | 9/14/2012 | 9/17/2012 | 9/17/2012 10:01:32 AM | A | FAIL |
|
|
All items passed except a map at the facp is needed as discussed.
|