Inspections for the day of: Monday, September 17, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00063 General Inspection9/17/20129/17/20129/18/2012 2:07:40 PM PASS
ESC12-00403 Conference9/17/20129/17/20129/17/2012 2:57:06 PMADONE
Today the city of Boise and ACHD conducted a confrence with John Beck And Noel Spencer from Hoffman construction. We explained the stop work order to all dewatering activities offsite. Giving them the requirements to have the stop work order removed. We explained the water quality standards of the state of Idaho DEQ with construction projects, and the requirement with their federal permit , (CGP). we eplainecd that they must report that an ilicit discharge did occur offsite into the MS4 system discharging into the Boise River through the 9th st. outfall. We also gave them a brief training on NTU levels by showing the sample jar of 10, 50, 100, and 800 NTU levels and the differnce between them regarding clarity.

At this time, the stop work order is still posted and waiting on ACHD to give the approval to pump into the MS4.
ESC12-00364 General Inspection9/17/20129/17/20129/17/2012 2:24:14 PM PASS
ESC11-00592 Aging Inspection9/17/20129/17/20129/17/2012 1:21:50 PM DONE
Permit finaled.
ESC11-00592 DOC - Permit Finaled9/17/20129/17/20129/17/2012 1:20:57 PMPPASS
ESC10-00495 General Inspection9/17/20129/17/20129/17/2012 8:43:06 AM FAIL
Must initate stabilization practices sooner than later. Will contact the RP over the concerns.
ESC12-00577 Site Preparation9/17/20129/17/20129/17/2012 8:41:34 AM PASS
ESC11-00025 Aging Inspection9/17/20129/17/20129/17/2012 8:16:59 AM DONE
Permit finaled.
ESC11-00025 DOC - Permit Finaled9/17/20129/17/20129/17/2012 8:16:42 AMPPASS