FIR13-00274
| INSP-Final Inspection | 9/17/2013 | 9/17/2013 | 9/18/2013 11:04:18 AM | P | CANC |
|
|
Rescheduled for tomorrow after 4pm with Forrest
|
BLD12-01487
| FIRE-Final Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 3:46:08 PM | P | PART |
|
|
Life safety in the Service Bay expansion is passed.
|
BLD13-01907
| FIRE-Final Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 3:13:59 PM | P | FAIL |
|
|
Provide annual inspection for the fire extinguishers, reverse the hardware to the reception door or provide passage hardware, meet with plan reviewer to resolve island restroom exiting and provide occupancy permit for the tenant occupying the tenant space.
|
BLD13-01539
| FIRE-Conference | 9/16/2013 | 9/17/2013 | 9/17/2013 12:51:49 PM | A | DONE |
|
|
charles miller and I went over the exiting requirements which appear to have been approved through plan review. We also discussed inspections needed for the re-routed fire line. I deferred him to the fire dept for requirements to temporarily shut down on site fire hydrants.
|
BLD13-02480
| FIRE-Final Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 12:49:47 PM | P | PASS |
|
|
Life safety passed
|