Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCB14-00107 GCB-Fire Wall9/17/20149/17/20149/17/2014 4:41:42 PMPPART
Dan 6023255 first floor first layer of sheetrock ok to cover with second layer.
GCB14-00106 GCB-Fire Wall9/17/20149/17/20149/17/2014 4:41:14 PMPPART
Dan 6023255 first floor first layer of sheetrock ok to cover with second layer.
GCB14-00105 GCB-Fire Wall9/17/20149/17/20149/17/2014 4:40:48 PMPPART
Dan 6023255 first floor first layer of sheetrock ok to cover with second layer.
GCB14-00072 GCB-Fndatn/slab ins/fld vent9/17/20149/17/20149/17/2014 4:39:19 PMPPASS
foundation inspection to cover Richard ###-####
treated plywood and 60lb paper ok to cover with hard insulation
GCB14-00109 GCB-Fndatn/slab ins/fld vent9/16/20149/17/20149/17/2014 3:37:26 PMPPASS
Ryan ###-####
GCB14-00087 GCB-Framing9/17/20149/17/20149/17/2014 3:37:25 PMPPASS
Erin 4843653
GCB14-00042 GCB-Final9/16/20149/17/20149/17/2014 2:01:42 PMPFAIL
###-#### call first 1 hour notice please needs to fix ada rest rooms
BLD14-01866 BLD-Footing9/17/20149/17/20149/17/2014 11:33:27 AMADONE
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD14-00948 BLD-Other9/16/20149/17/20149/17/2014 11:32:47 AMAPEND
Grout pour at 12 - Mike Phone #: ###-#### ok after spec inspection
BLD13-03178 BLD-Final9/16/20149/17/20149/17/2014 11:32:12 AMAFAIL
Call Matt 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Chris Laraway needs a co2 detector up stair out side of bedrooms
BLD14-02334 BLD-Foundation9/17/20149/17/20149/17/2014 9:57:42 AMAPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD14-00038 BLD-Framing/Rough-in9/16/20149/17/20149/17/2014 9:43:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Peter Kilpatrick ph 2 med rm ok to cover after other trades ok rough ins
GCB14-00116 GCB-Fndatn/slab ins/fld vent9/16/20149/17/20149/17/2014 9:13:34 AMAPASS
Raina ###-####