BLD14-01237
| FIRE-Final Inspection | 9/17/2014 | 9/17/2014 | 9/17/2014 3:20:04 PM | P | PASS |
|
|
Life safety passed
|
FIR14-00541
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 3:09:10 PM | A | CANC |
|
|
Underground cover previously approved.
|
FIR14-00447
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 2:50:00 PM | P | PASS |
|
|
Rough-in passed. Overhead hydro tests passed. Piping can not be covered until a tenting inspection has been performed.
|
BLD13-01688
| FIRE-Final Inspection | 9/16/2014 | 9/17/2014 | 9/17/2014 2:49:05 PM | P | PART |
|
|
Remodeled portion of Main Lobby and connecting corridor life safety passed. Electritian is to repair an existing exit sign in the path of egress.
|
FIR14-00454
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 1:36:48 PM | A | PASS |
|
|
Overhead hydro test passed. Flexible couplings added and branch line restraints provided. Piping can be covered.
|
FIR14-00356
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 11:26:50 AM | P | CANC |
|
|
Underground hydro - Brandon Phone #: ###-####
|
FIR14-00417
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 11:26:39 AM | P | CANC |
|
|
Underground hydro - Brandon Phone #: ###-####
|
FIR14-00396
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 11:26:28 AM | P | CANC |
|
|
Underground hydro - Brandon Phone #: ###-####
|
FIR14-00416
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 11:26:06 AM | P | CANC |
|
|
Underground hydro - Brandon Phone #: ###-####
|
FIR14-00357
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 11:25:54 AM | P | CANC |
|
|
Underground hydro - Brandon Phone #: ###-####
|
FIR14-00354
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 11:15:02 AM | A | PASS |
|
|
Overhead 200lb hydro for all four new dry pipe systems passed
|
FIR14-00551
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 10:27:49 AM | P | PASS |
|
|
Rough-in passed. Piping is ok to cover
|
FIR14-00418
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 10:26:38 AM | A | PASS |
|
|
Rough-in passed. Tenting passed. Piping is ok to cover.
|
FIR14-00417
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 10:26:09 AM | A | PASS |
|
|
Rough-in passed .Tenting passed. Piping is ok to cover.
|
FIR14-00442
| INSP-Final Inspection | 9/16/2014 | 9/17/2014 | 9/17/2014 9:41:46 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00432
| INSP-Final Inspection | 9/16/2014 | 9/17/2014 | 9/17/2014 9:40:25 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00440
| INSP-Sprinkler Rough-in | 9/16/2014 | 9/17/2014 | 9/17/2014 8:26:28 AM | A | PASS |
|
|
Rough to cover for the 2nd floor passed. Piping can be covered.
|
FIR14-00454
| INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/16/2014 2:36:58 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|