ESC15-00285
| Aging Inspection | 9/17/2015 | 9/17/2015 | 9/18/2015 2:16:43 PM | | CANC |
|
|
|
ESC15-00283
| Aging Inspection | 9/17/2015 | 9/17/2015 | 9/18/2015 10:35:22 AM | | PASS |
|
|
WIP on interior of townhomes. Portapot, dumpsters, and materials still onsite. Access road is complete and landscaping is installed. No trash issues at perimeter, discharges, or trackout. Approved.
|
ESC15-00284
| Aging Inspection | 9/17/2015 | 9/17/2015 | 9/18/2015 10:35:05 AM | | PASS |
|
|
WIP on interior of townhomes. Portapot, dumpsters, and materials still onsite. Access road is complete and landscaping is installed. No trash issues at perimeter, discharges, or trackout. Approved.
|
ESC15-00279
| Aging Inspection | 9/17/2015 | 9/17/2015 | 9/18/2015 10:34:45 AM | | PASS |
|
|
WIP on interior of townhomes. Portapot, dumpsters, and materials still onsite. Access road is complete and landscaping is installed. No trash issues at perimeter, discharges, or trackout. Approved.
|
ESC15-00280
| Aging Inspection | 9/17/2015 | 9/17/2015 | 9/18/2015 10:34:30 AM | | PASS |
|
|
WIP on interior of townhomes. Portapot, dumpsters, and materials still onsite. Access road is complete and landscaping is installed. No trash issues at perimeter, discharges, or trackout. Approved.
|
ESC15-00094
| Random Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 4:56:50 PM | P | PASS |
|
|
Checked unvegetated and recently graded hillsides for erosion and sediment runoff. Hillside slope tracking, compaction, and placement of wattles seems to have contained sediment on site except in one small area.
Some maintenance and cleanup will be necessary but site BMPs performed well considering the intensity and duration of rainfall.
|
ESC15-00065
| General Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 4:46:46 PM | | PASS |
|
|
Home near completion. No activity at time of construction. The recently graded back yard that had slopes compacted and tracked did not suffer any rill or gully erosion during the afternoon's rain storm. No sediment runoff observed.
|
ESC15-00282
| General Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 4:07:49 PM | | PASS |
|
|
Construction complete and new DIs fitted with sediment bags. No Knife River equipment or materials left on site. Tahoe and Hunter should begin work on this new block this Fall. Lots have been graded and prepped for SFH construction.
|
ESC15-01039
| Site Preparation | 9/17/2015 | 9/17/2015 | 9/17/2015 4:05:08 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Tahoe sites in DHE#12 are in good condition with BMPs installed. Approved.
|
ESC14-00588
| General Inspection | 9/15/2015 | 9/17/2015 | 9/17/2015 4:04:30 PM | A | PASS |
|
|
WIP. No trackout to Parkcenter or muddy runoff from site. No dewatering currently. Site walk through to be conducted tomorrow or next week
|
ESC15-00291
| General Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 3:20:47 PM | | PASS |
|
|
Carport and all other construction complete at Landmark Apartments. No loose sediment or disturbed area remaining. All permits finaled.
|
ESC15-00291
| DOC - Permit Finaled | 9/17/2015 | 9/17/2015 | 9/17/2015 3:19:57 PM | P | PASS |
|
|
|
ESC15-00294
| General Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 9:06:12 AM | | PASS |
|
|
Interior remodel complete. No disturbed area or loose soils at site. Permit conditions satisfied.
|
ESC15-00294
| DOC - Permit Finaled | 9/17/2015 | 9/17/2015 | 9/17/2015 9:05:29 AM | P | PASS |
|
|
|