Inspections for the day of: Thursday, September 17, 2015.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00707 General Inspection9/17/20159/17/20159/17/2015 3:36:12 PM PASS
2 New Drains have been installed along with silt fence along the bottom drain, and straw waddle along the upper slope of newly dug drainage ditch. Rock check dam has also been installed with jute mate/erosion blanket.
ESC13-00520 General Inspection9/17/20159/17/20159/17/2015 3:35:34 PM PASS
2 New Drains have been installed along with silt fence along the bottom drain, and straw waddle along the upper slope of newly dug drainage ditch. Rock check dam has also been installed with jute mate/erosion blanket.
ESC15-00310 General Inspection9/17/20159/17/20159/17/2015 3:17:08 PM PASS
ESC14-00488 General Inspection9/17/20159/17/20159/17/2015 10:33:42 AM PASS
ESC15-00306 General Inspection9/17/20159/17/20159/17/2015 9:03:56 AM PASS
WIP: Some minor hauling taking place, street sweeper currently sweeping. No ESC issues observed at this time