PLM18-03266
| Final | 9/17/2018 | 9/17/2018 | 9/17/2018 4:11:27 PM | P | PASS |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by KEVIN FRANKLIN
|
PLM18-03592
| Water and/or Sewer | 9/12/2018 | 9/17/2018 | 9/17/2018 3:14:55 PM | P | PART |
|
|
Water inspection - Darrell Carter is on site contact Phone #: ###-#### Inspection requested via web by Mike Basabe water svc ok to cover start 24 hr grease int test
|
PLM18-03902
| Sprinkler (Final) | 9/17/2018 | 9/17/2018 | 9/17/2018 2:38:14 PM | P | FAIL |
|
|
Stan Phone #: ###-#### the pvb must be 12" above the highest outlet. raise 16" with metal pipe
|
PLM18-01998
| Final | 9/17/2018 | 9/17/2018 | 9/17/2018 2:27:05 PM | P | NR |
|
|
Jacob Phone #: ###-####
|
PLM18-03939
| Groundwork | 9/14/2018 | 9/17/2018 | 9/17/2018 2:07:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM18-03930
| Groundwork | 9/14/2018 | 9/17/2018 | 9/17/2018 2:07:25 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM18-02637
| Final | 9/14/2018 | 9/17/2018 | 9/17/2018 1:53:36 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-03904
| Plumbing Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 1:37:32 PM | P | PASS |
|
|
|
PLM18-01863
| Plumbing Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 1:32:01 PM | P | CANC |
|
|
wrong address
|
PLM18-03886
| Final | 9/17/2018 | 9/17/2018 | 9/17/2018 1:12:06 PM | P | PASS |
|
|
|
PLM18-03886
| Final | 9/17/2018 | 9/17/2018 | 9/17/2018 12:48:51 PM | P | CANC |
|
|
|
PLM18-03543
| Final | 9/13/2018 | 9/17/2018 | 9/17/2018 12:47:33 PM | A | PASS |
|
|
General contractor will be onsite monday for access. Call Bill Kirk with any questions 208.880.3988 Phone #: ###-#### Inspection requested via web by Bill Kirk
|
PLM18-03844
| Water and/or Sewer | 9/10/2018 | 9/17/2018 | 9/17/2018 12:03:54 PM | P | NR |
|
|
LATE PM INSPECTION. CALL AHEAD PLUMBER BRIAN ###-#### Phone #: ###-#### Inspection requested via web by Chris Field rescheduled
|
PLM18-03886
| Final | 9/14/2018 | 9/17/2018 | 9/17/2018 10:54:20 AM | A | FAIL |
|
|
Please call Byron Ely prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette. Install a drip leg on the gas line. remove black nipple on the cold water feed
|
PLM18-03863
| Final | 9/14/2018 | 9/17/2018 | 9/17/2018 10:54:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM18-03932
| Plumbing Rough-in | 9/14/2018 | 9/17/2018 | 9/17/2018 9:57:42 AM | A | CANC |
|
|
Please call Genado at ###-#### before coming so he can meet you there and open the door. If he doesn’t answer or there are other issues please give me a call. Thanks. Phone #: ###-#### >> Inspection requested via web by Josh Johnson Inspection cancelled from web by: Josh Johnson
|
PLM17-04381
| PLM-Aging Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 7:55:56 AM | | NR |
|
|
wip
|
PLM17-04183
| PLM-Aging Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 7:55:27 AM | | NR |
|
|
wip
|