ELE00-02776
| Electrical Rough-In | 9/15/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | A | PASS |
|
|
Clark Holley ###-####. ele r/i; addition. 9/18/2000 10:31:27 AM
|
ELE00-03625
| Final | 9/15/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | A | PASS |
|
|
Alan Kellogg ###-####. classroom '22' florescent light fixture installation. 9/19/2000 9:22:48 PM
|
ELE00-02303
| Electrical Rough-In | 9/15/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | A | CANC |
|
|
FOR CONF JOE-- ###-####--FOR HOMEOWNER . called in wrong permit number. 9/18/2000 10:30:23 AM
|
ELE00-03455
| Electrical Rough-In | 9/18/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 403 On 9/18/2000 CONFERENCE: MAIN/SERVICE DISCONNECT INSTALLATION.
|
ELE00-03598
| Final | 9/15/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 13:35:40. Contact: . nec: 680-8. overhead conductor clearance.l
telephone cables shall maintain 10ft. clearance above water of spa. posted. 9/18/2000 5:55:38 PM
|
ELE00-01163
| Final | 9/18/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | P | PASS |
|
|
###-####. completed. 9/18/2000 5:52:50 PM
|
ELE00-01560
| Permanent Service | 9/18/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | P | PASS |
|
|
###-####. main service gear. 9/18/2000 5:48:50 PM
|
ELE00-02869
| Final | 9/18/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | P | PASS |
|
|
call Mike first ###-####. sub-panel 9/18/2000 5:49:45 PM
|
ELE00-03186
| Final | 9/18/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 09:53:42. Contact: ###-####. detached garage. 9/18/2000 5:51:19 PM 9/18/2000 5:52:02 PM
|
ELE00-03502
| Electrical Rough-In | 9/18/2000 | 9/18/2000 | 9/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 10:17:58. Contact: ###-####. ceiling ele r/i. 9/18/2000 5:50:31 PM
|