FIR01-00360
| FIR-Aging Inspection | 9/18/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | | NR |
|
|
WIP 9/18/2001 2:16:17 PM
|
FIR01-00329
| FIR-Aging Inspection | 9/18/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | | NR |
|
|
WIP 9/18/2001 2:16:33 PM
|
FIR01-00467
| INSP-Final Inspection | 9/17/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | A | PART |
|
|
OK on hydro test 9/18/2001 12:44:08 PM
|
FIR01-00078
| INSP-Sprinkler Rough-in/Hydro | 9/14/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | A | FAIL |
|
|
Hydro test fail 9/18/2001 11:34:39 AM
|
FIR01-00078
| INSP-Supply line flush | 9/14/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 14:14:01. Contact: ###-####.
|
BLD01-01679
| FIRE-Final Inspection | 9/17/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | A | FAIL |
|
|
Reinsp fail need supr of alarm line control vlv 9/18/2001 12:45:18 PM
|
BLD01-01601
| FIRE-Final Inspection | 9/17/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | P | FAIL |
|
|
Final fail C/N issued 9/18/2001 4:57:46 PM
|
FIR01-00290
| INSP-Sprinkler Rough-in/Hydro | 9/14/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | P | PART |
|
|
OK on spklr rough in after instal of several hold down brackets 9/18/2001 3:23:39 PM
|
FIR01-00314
| INSP-Final Inspection | 9/17/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | P | PART |
|
|
OK on supply line flush and Ok on underground hydro test 9/18/2001 4:04:27 PM
|
FIR01-00343
| INSP-Sprinkler Rough-in/Hydro | 9/17/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | P | PART |
|
|
Ok on above ground hydro test of dry system. FDC piping still needs hydro test 9/18/2001 2:15:19 PM
|
FIR01-00448
| INSP-Alarm Testing | 9/18/2001 | 9/18/2001 | 9/18/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 406 On 9/18/2001 5:25:40 PM Reinsp OK for certificate of completion
|