Inspections for the day of: Wednesday, September 18, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01940 BLD-Final9/13/20029/18/20029/18/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/13/2002 at 13:54:04. Contact: ###-####.home owners didnt now that set of stairs needed handrair its the ext steps going up to front door they will install and reschedule final 9/18/2002 12:04:44 PM
BLD02-01996 BLD-Footing9/17/20029/18/20029/18/2002 12:00:00 AMAFAIL
###-#### no plans on site and no access into project 9/18/2002 12:24:06 PM
MEC02-02561 Rough-in9/17/20029/18/20029/18/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/17/2002 at 11:34:13. Contact: ###-####. dryer venting not to code 9/18/2002 10:44:29 AM
MEC02-02561 Pressure Test9/17/20029/18/20029/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/17/2002 at 11:34:48. Contact: ###-####.
MEC02-01694 Final9/17/20029/18/20029/18/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/17/2002 at 13:11:19. Contact: ###-####. c/n on site 9/18/2002 11:34:17 AM
MEC02-02441 Rough-in9/17/20029/18/20029/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/17/2002 at 17:35:25. Contact: ###-####.
MEC02-01380 Final9/18/20029/18/20029/18/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/18/2002 at 06:42:29. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/18/2002 at 07:00:59.
MEC02-02635 Pressure Test9/18/20029/18/20029/18/2002 12:00:00 AMPPASS
###-#### HAROLD PLEASE CALL FOR ACCESS THEY HAVE A DOG
MEC02-02635 Final9/18/20029/18/20029/18/2002 12:00:00 AMPPASS
###-#### HAROLD PLEASE CALL FOR ACCESS THEY HAVE A DOG
MEC02-02638 Rough-in9/18/20029/18/20029/18/2002 12:00:00 AMPNR
r/i- joe- ###-####
BLD02-02239 BLD-Footing9/18/20029/18/20029/18/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/18/2002 at 10:58:26. Contact: ###-####.
BLD02-01858 BLD-Final9/18/20029/18/20029/18/2002 12:00:00 AMPPASS
Tim, ###-####- call Cathy when & if demo was completed. Thanks!
BLD01-02399 BLD-Conference9/18/20029/18/20029/18/2002 12:00:00 AMPDONE
Scheduled by a contractor via Hello! on 09/18/2002 at 11:16:55. Contact: ###-####. discussion on min requirements for finished space 9/19/2002 9:29:55 AM