PLM02-02862
| Water and/or Sewer | 9/17/2002 | 9/18/2002 | 9/18/2002 12:00:00 AM | A | PASS |
|
|
john- ###-####
|
PLM02-00906
| Plumbing Rough-in | 9/17/2002 | 9/18/2002 | 9/18/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 15:29:08. Contact: ###-####. GRID D2 FROM 1ST FLOOR TO ROOF
|
PLM02-02863
| Sprinkler (Final) | 9/17/2002 | 9/18/2002 | 9/18/2002 12:00:00 AM | A | PASS |
|
|
###-#### MATT OR AMY
|
PLM02-02641
| Water and/or Sewer | 9/18/2002 | 9/18/2002 | 9/18/2002 12:00:00 AM | A | FAIL |
|
|
buess exc exposed cooling tower supply and return. needs to expose 3" WATER LINE TO CHECK MATERIAL.
|
PLM02-02854
| Water and/or Sewer | 9/17/2002 | 9/18/2002 | 9/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 14:59:57. Contact: ###-####.
|
PLM02-02054
| Final | 9/18/2002 | 9/18/2002 | 9/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/18/2002 at 08:44:09. Contact: ###-####.
|