Inspections for the day of: Thursday, September 18, 2003.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01641 BLD-Final9/17/20039/18/20039/18/2003 12:00:00 AMAPASS
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-01562 BLD-Framing/Rough-in9/17/20039/18/20039/18/2003 12:00:00 AMAPASS
RICK; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
MIS03-00186 BLD-Conference9/17/20039/18/20039/18/2003 12:00:00 AMACANC
return bond & code report to cathy may ...dld BACK DOOR WILL BE OPEN this is in the county but will be moved to boise city at this address 2618 shoshone. 301 is not the insp. of 2618 shoshone tran. to 408. 9/17/2003 3:45:28 PM
BLD02-02768 BLD-Final9/17/20039/18/20039/18/2003 12:00:00 AMAPASS
###-#### sid......please note the parcel hold says not to final this without finaling bld00-03496 c/o ok 9/18/2003 10:47:57 AM
BLD00-03496 BLD-Final9/17/20039/18/20039/18/2003 12:00:00 AMAPASS
###-#### sid.......please note the parcel hold say that this permit & bld02-02768 need to be finaled together l/c ok 9/18/2003 10:48:11 AM
BLD03-01312 BLD-Final9/17/20039/18/20039/18/2003 12:00:00 AMAPASS
steve; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD00-01815 BLD-Framing/Rough-in9/17/20039/18/20039/18/2003 12:00:00 AMAFAIL
left over. 9/17/2003 1:05:14 AM 9/17/2003 1:05:45 AM 9/17/2003 1:06:29 AM 1003.3.3.8.2 ubc/chalk and seal. c/n 9/18/2003 9:26:29 AM
BLD03-01163 BLD-Final9/17/20039/18/20039/18/2003 12:00:00 AMAFAIL
left over 9/17/2003 1:09:41 AM need plm and ele. 9/18/2003 11:18:18 AM
BLD03-01562 BLD-Energy code compliance9/18/20039/18/20039/18/2003 12:00:00 AMAPASS
BLD03-01964 BLD-Foundation9/18/20039/18/20039/18/2003 12:00:00 AMPPART
jared; Phone #: ###-#### Internet Inspection Request from: Darla Downs pw/oi 9/18/2003 3:38:45 PM
BLD03-02024 BLD-Foundation9/17/20039/18/20039/18/2003 12:00:00 AMPPART
wip 9/18/2003 3:48:38 PM
BLD03-01902 BLD-Footing9/15/20039/18/20039/18/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/15/2003 at 12:52:30 PM. Contact: ###-####. covered w specal insp. 9/18/2003 1:48:59 PM
BLD03-01313 BLD-Framing/Rough-in9/18/20039/18/20039/18/2003 12:00:00 AMPPART
###-#### ted ###-#### ted fire proofing patches ok ceiling ok/ fire damper aplacation needs verified with mech insp. w/acess door labled./fire alarm plans not isued at this time from plan review. 9/18/2003 2:54:30 PM
BLD03-01324 BLD-Final9/18/20039/18/20039/18/2003 12:00:00 AMPCANC
jim; Phone #: ###-#### Internet Inspection Request from: Marc Lileks fire not complet for temp occ waiting for previous fir c/n no insp performed. 9/18/2003 3:54:09 PM
BLD00-03428 BLD-Foundation9/18/20039/18/20039/18/2003 12:00:00 AMPPART
randy; Phone #: ###-#### Internet Inspection Request from: Marc Lileks walls at previous ft location placed with special insp as well as elavator pit. 9/18/2003 2:55:39 PM