Inspections for the day of: Monday, September 18, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-02111 ELE-Aging Inspection9/18/20069/18/20069/20/2006 7:51:42 AM DONE
ELE06-03473 Electrical Rough-In9/18/20069/18/20069/19/2006 1:06:46 PMPPASS
Work performed by Aaron White.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz ok
ELE06-00460 Electrical Rough-In9/18/20069/18/20069/19/2006 10:48:26 AMPPART
duke; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley walls front entry elevator equip rm
ELE06-03477 Conference9/18/20069/18/20069/18/2006 4:35:22 PMPDONE
HANS ###-#### ok
ELE06-03382 Conference9/18/20069/18/20069/18/2006 3:29:23 PMPDONE
ok
ELE06-03393 Permanent Service9/18/20069/18/20069/18/2006 2:50:45 PMPPASS
p/s o/h new ok
ELE06-03393 Rough-In Permanent Service9/18/20069/18/20069/18/2006 2:50:01 PMPFAIL
jack ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr. called 300.4 (A)(1) still needs nail plates for holes where holes are less than 11/4" from edges of framing members as code noted states
see added p/s
ELE06-03194 Rough-In Permanent Service9/18/20069/18/20069/18/2006 2:06:03 PMPPART
Scheduled by a contractor via Hello! on 9/18/2006 at 7:53:01 AM. Contact: ###-####. makeup ok
ELE06-02207 Final9/18/20069/18/20069/18/2006 1:53:42 PMPFAIL
ted; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr. not made, 410.8 (A) needs clearence from storage space MB closet
ELE06-03439 Permanent Service9/18/20069/18/20069/18/2006 1:35:24 PMPPASS
stu; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley p/s o/h rec. ok
ELE06-02491 Final9/15/20069/18/20069/18/2006 9:54:49 AMAFAIL
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr. fee due called left message, 110.3)B) shall follow manufactures instructions , p/s disconnect olny service rated if manufactures neutral kit is used, xformer shall be grd as 250.30 states, 250.52(A)(1) shall bond all piping together so it is electrically continuous, BCC shall not use romex for commercial work
ELE06-02976 Electrical Rough-In9/15/20069/18/20069/18/2006 9:21:20 AMAFAIL
sergey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
all violations not corrected and new one created, also not ready, 300.4 nail plates, 314.16 box fill, still needs calculations for circuits for new addition and service, 110.14(B) shall use approved tool for crimps loose equip grds told owner if corrections not made we will have to secure contractor
ELE06-03453 Temporary Service9/16/20069/18/20069/18/2006 8:38:59 AMAPASS
Phone #: ###-#### Internet Inspection Request from: kendall bender
t/s u/g new ok
ELE06-01930 Final9/15/20069/18/20069/18/2006 8:14:36 AMAPASS
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok