FIR07-00685
| INSP-Sprinkler Rough-in/Hydro | 9/18/2007 | 9/18/2007 | 9/19/2007 10:52:32 AM | P | FAIL |
|
|
New upright heads are overspaced at the open work area, overhead install at the drop ceilings is approved for cover.
|
BLD07-01698
| FIRE-Final Inspection | 9/18/2007 | 9/18/2007 | 9/18/2007 4:26:40 PM | P | PASS |
|
|
Fire life safety inspection passed, missing suite numbers to be installed per contractor agreement.
|
BLD07-01440
| FIRE-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 3:01:17 PM | A | PASS |
|
|
Fire life safety passed inspection, manual flush bolts at the main entry/exit door inactive leaf to be replaced with automatic bolts prior to sturctural final as discussed with contractor.
|
FIR07-00617
| INSP-Final Inspection | 9/18/2007 | 9/18/2007 | 9/18/2007 1:59:40 PM | P | PASS |
|
|
Required changes have been completed, some issues repaired while on site, signals verified, fire alarm permit finaled.
|
FIR07-00252
| FIR-Aging Inspection | 9/18/2007 | 9/18/2007 | 9/18/2007 1:52:19 PM | | DEFR |
|
|
Under construction, work in progress.
|
FIR07-00740
| INSP-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 1:50:39 PM | A | PASS |
|
|
Install had been covered prior to rough-in inspection request, contractor was provided on site to expose work for inspection as needed, noted three retaining straps at beam clamps which were not secured correctly-contractor agreed to repair today, need to install missing ceiling tile at the corridor, field modifications in pipe routing noted and accepted, fire sprinkler permit finaled.
|
BLD05-00038
| FIRE-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 1:37:08 PM | A | PASS |
|
|
Items from the previous correction notice have been verified for completion, noted the provided PFE is past due annual certification-tenant has made arrangements for testing today, no card available for signature on site.
|
FIR07-00475
| INSP-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 1:30:48 PM | A | PASS |
|
|
Fire alarm work passed field testing, permit finaled.
|
BLD07-01984
| FIRE-Final Inspection | 9/17/2007 | 9/18/2007 | 9/18/2007 1:29:32 PM | A | PASS |
|
|
Life safety is acceptable, noted signage at the main entry/exit door to be installed prior to structural final, locking hardware at the door to the storage mezzanine to be removed as agreed.
|
FIR07-00344
| INSP-Sprinkler Rough-in/Hydro | 9/17/2007 | 9/18/2007 | 9/18/2007 11:14:11 AM | A | CANC |
|
|
Need a rough-in & overhead hydro. Please call 1/2 hour prior to inspection. Jeremy is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|