Inspections for the day of: Thursday, September 18, 2008.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02303 BLD-Framing/Rough-in9/18/20089/18/20089/20/2008 9:08:37 AMPFAIL
Brad Phone #: ###-#### ceiling grid 4th floor note to code
BLD08-01348 BLD-Framing/Rough-in9/17/20089/18/20089/18/2008 3:32:39 PMPNR
Joe- wall Phone #: ###-####
BLD08-01348 BLD-Foundation9/18/20089/18/20089/18/2008 3:32:29 PMPPASS
Joe- wall Phone #: ###-####
BLD08-01294 BLD-Conference9/18/20089/18/20089/18/2008 3:03:39 PMPCANC
BLD08-01963 BLD-Footing9/18/20089/18/20089/18/2008 3:02:26 PMPPASS
Scheduled by a contractor via Hello! on 9/18/2008 at 7:44:38 AM. Contact: ###-####.
BLD07-03219 BLD-Framing/Rough-in9/17/20089/18/20089/18/2008 2:39:31 PMPPART
J.R- ceiling cover Phone #: ###-####needs to wire up mec fixtures ok to start laying in edge tiles
BLD08-01188 BLD-Grading Inspection9/18/20089/18/20089/18/2008 2:26:00 PMPPASS
BLD08-01188 BLD-Final9/18/20089/18/20089/18/2008 2:25:44 PMPFAIL
needs to lower sinks landing outside of backdoor
BLD07-01910 BLD-Concrete9/17/20089/18/20089/18/2008 12:50:56 PMAPART
russ Note: pouring at noon Phone #: ###-####
BLD05-02314 BLD-Final9/17/20089/18/20089/18/2008 12:50:31 PMAPASS
BLD08-01188 BLD-Final9/17/20089/18/20089/18/2008 12:48:41 PMANR
andy Phone #: ###-#### needs other trades to final first
BLD08-01913 BLD-Foundation9/17/20089/18/20089/18/2008 10:36:50 AMAPASS
Mike Phone #: ###-####
BLD06-02559 BLD-Final9/17/20089/18/20089/18/2008 10:05:13 AMAPASS
BLD06-02559 DOC - Permit Finaled9/18/20089/18/20089/18/2008 10:05:04 AMPPASS
BLD08-01703 BLD-Framing/Rough-in9/18/20089/18/20089/18/2008 9:40:54 AMAPART
Scheduled by a contractor via Hello! on 9/17/2008 at 8:35:41 AM. Contact: ###-####. ok tocover ceiling