Inspections for the day of: Thursday, September 18, 2008.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01351 FIRE-Final Inspection9/17/20089/18/20089/18/2008 3:37:17 PMAFAIL
Provide exit signs/emergency lights as discussed and marked on the city approved plans and provide approved door hardware as discussed and shown on the approved plans.
FIR08-00523 INSP-Alarm Testing9/17/20089/18/20089/18/2008 1:47:25 PMADONE
Todays inspection was just for the sixth floor. Horn/strobe placement and candella apppears to match the plans. One strobe as marked on the plans needs to be relocated 2' to the south to be within 15'-0" of the end of the corridor. We did not activate the audio/visuals. All of the heat pumps shut down when tested. The induct detectors are mounted half in and half out of the return duct openings. Per the installation guide they are to be placed a minumum six duct widths from the openings. Simplex stated that their engineers said it was ok to be installed that way. I verified with Stephanie that no such verification had been provided with this submittal. Simplex stated that they would provide this information as soon as possible. I told them to provide it to the plan reviewer. Todays testing was completed on that note.