BLD09-00267
| BLD-Concrete | 9/17/2009 | 9/18/2009 | 9/18/2009 4:28:42 PM | A | PART |
|
|
Pour back section of slabs at Phase 2C at 3:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu OK .... pend MTI insp, tests and approvals.
|
MIS09-00169
| BLD-Final | 9/18/2009 | 9/18/2009 | 9/18/2009 3:28:48 PM | P | PASS |
|
|
I have been told that all work is being completed as this time and they are ready for the final inspection this afternoon. Please contact Lydia Richards at number for access. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer
All corrections completed. PASS
|
BLD07-02083
| BLD-Final | 9/17/2009 | 9/18/2009 | 9/18/2009 12:30:01 PM | A | PEND |
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection of all rooms except Electr and Elevator..........OK. Verified by (2) letters that (2) approx 5-0x6-0 windows at North side of bldg ....adjacent to double doors are Tempered units. Jambs are covering etching. The Manufacturer...... General glass Co. Portland Ore. ###-#### Work order # 039680 verified glass mentioned above was Tempered. Mid Valley Glass Eugene Ore. ###-#### 9/17/09 Was window Contractor.....Doug Jordon ###-#### was in charge and provided letter mentioned above.
|
BLD09-00878
| BLD-Final | 9/17/2009 | 9/18/2009 | 9/18/2009 11:00:49 AM | A | PASS |
|
|
Ray Phone #: ###-#### C/C issued
|
BLD09-00878
| DOC - Permit Finaled | 9/18/2009 | 9/18/2009 | 9/18/2009 11:00:31 AM | P | PASS |
|
|
|
BLD09-01415
| BLD-Energy code compliance | 9/17/2009 | 9/18/2009 | 9/18/2009 10:46:42 AM | A | PASS |
|
|
Perry Phone #: ###-####
|
MIS09-00159
| BLD-Conference | 9/17/2009 | 9/18/2009 | 9/18/2009 9:23:12 AM | A | CANC |
|
|
Please contact Eric or Erin at the number provided for access. I have been told that you can go through the garage for access also. Please call Connie at ###-#### x106 before going out. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer Inspection cancelled from web by: Connie LaFrainer
|