FIR12-00076
| FIR-Aging Inspection | 9/18/2012 | 9/18/2012 | 9/21/2012 10:26:56 AM | | NR |
|
|
Per Steve, with SimplexGrinnell, these DSC permits will be called in the first part of October for inspections.
|
FIR12-00077
| FIR-Aging Inspection | 9/18/2012 | 9/18/2012 | 9/21/2012 10:26:40 AM | | NR |
|
|
Per Steve, with SimplexGrinnell, these DSC permits will be called in the first part of October for inspections.
|
FIR12-00078
| FIR-Aging Inspection | 9/18/2012 | 9/18/2012 | 9/21/2012 10:26:23 AM | | NR |
|
|
Per Steve, with SimplexGrinnell, these DSC permits will be called in the first part of October for inspections.
|
FIR11-00472
| FIR-Aging Inspection | 9/18/2012 | 9/18/2012 | 9/19/2012 8:49:52 AM | | NR |
|
|
I stopped by the job site and spoke to Dana about getting this project inspected and finaled. A follow up inspection is scheduled for next week.
|
FIR11-00568
| INSP-Final Inspection | 9/17/2012 | 9/18/2012 | 9/18/2012 3:50:14 PM | P | PASS |
|
|
permit finaled
|
FIR12-00286
| INSP-Sprinkler Rough-in/Hydro | 9/18/2012 | 9/18/2012 | 9/18/2012 3:09:57 PM | P | PASS |
|
|
Overhead rough-in and hydro test passed. Contractor to provide hydraulic calculations showing the six additional 2" elbows.
|
FIR12-00452
| INSP-Final Inspection | 9/17/2012 | 9/18/2012 | 9/18/2012 3:08:42 PM | A | FAIL |
|
|
Can't final until the ceiling tile has been installed.
|
BLD12-02409
| FIRE-Final Inspection | 9/17/2012 | 9/18/2012 | 9/18/2012 10:53:03 AM | A | PASS |
|
|
life safety passed
|
FIR12-00286
| INSP-Final Inspection | 9/17/2012 | 9/18/2012 | 9/18/2012 7:48:43 AM | A | CANC |
|
|
Please call Jeff Stom with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|