Inspections for the day of: Thursday, September 18, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00673 FIRE-Final Inspection9/18/20149/18/20149/18/2014 4:32:52 PMPPASS
Scope of vanilla cold shell work completed. Life safety passed provided building address numbers are posted facing Milwaukee street prior to structural final inspection as agreed.
BLD14-01124 FIRE-Final Inspection9/18/20149/18/20149/18/2014 4:19:37 PMPFAIL
Modifications to the existing fire sprinkler system will be required due to remodel work. Removal of the drop ceilings and interior walls has disrupted sprinkler coverage, head listings, response time index. Refer to scope of work for conditions regarding alterations to fire sprinkler systems.
FIR14-00631 INSP-Final Inspection9/18/20149/18/20149/18/2014 4:05:43 PMPPASS
Scope of fire sprinkler work completed and passed both rough-in and final inspections. Contractor to attatch auxillary drain sign at the drum drip as discussed.
BLD13-03489 FIRE-Final Inspection9/17/20149/18/20149/18/2014 4:01:17 PMPPASS
Life safety inspection passed.
FIR14-00635 INSP-Sprinkler Rough-in9/17/20149/18/20149/18/2014 1:31:40 PMAPART
Fire sprinkler work approved for cover at the sheetrock ceilings.
FIR14-00662 INSP-Sprinkler Rough-in9/17/20149/18/20149/18/2014 1:30:55 PMAPART
Overhead work approved for ceiling cover.
FIR14-00604 INSP-Sprinkler Rough-in9/18/20149/18/20149/18/2014 10:48:33 AMAFAIL
Items noted at initial rough-in inspection for the dry system 3rd floor building C include; Missing BB3 heads at three locations, missing SD3 heads at five locations, missing seismic braces at seven locations per plan, one head per plan is shown as a SSU and is installed as a BB3, two areas shown with coverage at "hips" are not protected. Some items corrected while on site- Inspection completed 9/16 PM. Also noted minor changes to pipe routing and head locations.
FIR14-00344 INSP-Sprinkler Rough-in9/18/20149/18/20149/18/2014 10:41:21 AMAFAIL
Items noted for rough-in inspection at the 3rd floor building C north end (four units and corridor) as marked/dated on stamped plans include; provide cap at the end of main per plan to meet NFPA 13 8.16.3, four additional 1 1/4 90's and piping have been added to calc area #2, maintain clearance from ceiling fans to pendent heads, overspaced coverage at one location due to a corridor wall not shown on drawings, not all light fixtures are recessed as indicated on plans, need to verify insulation or sprinkler coverage at combustible concealed spaces (chases) prior to cover, missing hanger at 1 1/4 branchline in the hall, min. spacing between heads is exceeded in the kitchen area at one unit, field modification to sprinklers and piping does not match plans in one unit (4 heads off 1" feed), missing head per plan at one ADA bathroom - provide coverage or delete and include change on plan mod, tenting at several areas insufficient and adjusted while on site. Also noted significant changes to field installation at the mechanical, data, corridor and trash rooms compared to the design and approved plan set.