FIR14-00416
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 3:39:00 PM | P | CANC |
|
|
Brandon-underground flushing Phone #: ###-####
|
FIR14-00419
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 3:38:51 PM | P | CANC |
|
|
Brandon-underground flushing Phone #: ###-####
|
FIR14-00418
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 3:38:42 PM | P | CANC |
|
|
Brandon-underground flushing Phone #: ###-####
|
FIR14-00417
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 3:38:29 PM | P | CANC |
|
|
Brandon-underground flushing Phone #: ###-####
|
FIR14-00356
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 3:38:20 PM | P | CANC |
|
|
Brandon-underground flushing Phone #: ###-####
|
FIR14-00357
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 3:37:08 PM | P | CANC |
|
|
Brandon-underground flushing Phone #: ###-####
|
FIR14-00666
| INSP-Final Inspection | 9/18/2014 | 9/18/2014 | 9/18/2014 3:04:20 PM | P | CANC |
|
|
Todd is on another project and could not meet with the city approved plans.
|
BLD14-01743
| FIRE-Final Inspection | 9/17/2014 | 9/18/2014 | 9/18/2014 3:01:21 PM | A | FAIL |
|
|
No fire sprinkler plans on site so I could not final the project related fire sprinkler permit
|
BLD14-01322
| FIRE-Final Inspection | 9/17/2014 | 9/18/2014 | 9/18/2014 2:33:00 PM | P | FAIL |
|
|
Provide exit signs as per the approved plans and panic hardware on the north exit door as per the plans.
|
FIR14-00551
| INSP-Final Inspection | 9/17/2014 | 9/18/2014 | 9/18/2014 2:32:25 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00630
| INSP-Final Inspection | 9/16/2014 | 9/18/2014 | 9/18/2014 2:31:38 PM | P | FAIL |
|
|
The north and south duct smoke detectors did not shut down the hvac units immediately as required per IMC 606.2.1. Since the units are less than 2,000cfm I gave Dutch the option of either fixing the shutdown or remove them all together and providing as-builts. The center duct detector and the Ansul hood did test ok.
|
FIR14-00396
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 12:41:37 PM | P | PASS |
|
|
Underground flush passed.
|
FIR14-00354
| INSP-Sprinkler Rough-in/Hydro | 9/18/2014 | 9/18/2014 | 9/18/2014 11:54:44 AM | P | PASS |
|
|
24 hour air test started on all four dry systems and 10:00am with the pressure marked in red on the guage.
|
FIR14-00551
| INSP-Final Inspection | 9/17/2014 | 9/18/2014 | 9/17/2014 11:32:38 AM | A | CANC |
|
|
Chris to attend Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|