BLD18-02977
| BLD-Aging Inspection | 9/18/2019 | 9/18/2019 | 9/20/2019 11:26:45 AM | | PEND |
|
|
|
BLD19-00419
| BLD-Aging Inspection | 9/18/2019 | 9/18/2019 | 9/20/2019 10:10:28 AM | | PEND |
|
|
|
BLD18-03119
| BLD-Final | 9/13/2019 | 9/18/2019 | 9/19/2019 12:52:22 PM | P | DONE |
|
|
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.
Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.
If all goes well, we are hoping to move in this weekend.
Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
|
BLD19-00796
| BLD-Final | 9/18/2019 | 9/18/2019 | 9/18/2019 3:46:12 PM | P | DONE |
|
|
Chris Phone #: ###-####
|
BLD19-00796
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 3:46:04 PM | P | PASS |
|
|
done per letter from engineer
|
BLD19-00043
| BLD-Other | 9/16/2019 | 9/18/2019 | 9/18/2019 3:16:48 PM | A | NH |
|
|
Mika Phone #: ###-####,, no answer on phone either
|
BLD19-00185
| BLD-Blower Door Test Results | 9/17/2019 | 9/18/2019 | 9/18/2019 3:07:33 PM | P | DONE |
|
|
Wes Phone #: ###-#### PLEASE call for access// 4.2
|
BLD19-00185
| BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 3:07:15 PM | P | PASS |
|
|
Wes Phone #: ###-#### PLEASE call for access
|
BLD19-00185
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 3:07:07 PM | P | PASS |
|
|
|
MIS19-00306
| Set Bond Amount | 9/18/2019 | 9/18/2019 | 9/18/2019 2:30:20 PM | P | DONE |
|
|
Tim Phone #: ###-####// recomend a $1000 bond
|
BLD18-03129
| BLD-Conference | 9/17/2019 | 9/18/2019 | 9/18/2019 2:20:30 PM | P | DONE |
|
|
Call about possible work being done differently then what is on approved plans and being to close to property line// talked to the contractor,, sounds like a surveyer will shoot in the building
|
BLD18-01175
| BLD-Blower Door Test Results | 9/17/2019 | 9/18/2019 | 9/18/2019 2:14:32 PM | P | DONE |
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner/// 1.9
|
BLD18-01175
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 2:14:07 PM | P | PASS |
|
|
c of o issued
|
BLD18-01175
| BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 2:13:29 PM | P | PASS |
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner// glazing by front door is one piece per contractor/ window rep and has acid etch on bottom.. ok
|
BLD18-03119
| BLD-Blower Door Test Results | 9/13/2019 | 9/18/2019 | 9/18/2019 2:10:29 PM | P | NR |
|
|
Hi Tony- I’m ready for you. I am bonding for my sprinklers and sod and should have that processed with Melissa by noon.
Mark, the electrical inspector, gave me a punch list that I completed and he is inspecting this morning.
If all goes well, we are hoping to move in this weekend.
Thank you. Phone #: ###-#### Inspection requested via web by Brad Christensen
|
BLD19-03338
| BLD-Final | 9/18/2019 | 9/18/2019 | 9/18/2019 2:00:55 PM | P | DONE |
|
|
joel Phone #: ###-####// done,, gone
|
BLD19-03338
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 2:00:49 PM | P | PASS |
|
|
|
BLD19-02155
| BLD-Energy code compliance | 9/17/2019 | 9/18/2019 | 9/18/2019 12:51:40 PM | A | PART |
|
|
Jim Phone #: ###-####,, insulation ok but need an mechanical inspector to re-look at the B vent due to possible clearance issues// I will schedule a follow up after
|
BLD19-00550
| BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 12:00:39 PM | A | PASS |
|
|
Craig Phone #: ###-####// c/n made ok per plan review
|
BLD19-00550
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 12:00:18 PM | P | PASS |
|
|
|
BLD19-00550
| BLD-Blower Door Test Results | 9/18/2019 | 9/18/2019 | 9/18/2019 11:55:08 AM | P | DONE |
|
|
Craig Phone #: ###-####/// 3.8
|
BLD19-03369
| BLD-Footing | 9/17/2019 | 9/18/2019 | 9/18/2019 11:37:35 AM | A | NR |
|
|
Inspection is for rebar in swimming pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post near the pool equipment. If you have any questions please don''t hesitate to call. Thank you Phone #: ###-#### Inspection requested via web by Brandy McConkey// needs electrical pass 1st,, needs clearance from soils/rebar,, need to remove all roots and debris
|
BLD19-00796
| BLD-Conference | 9/16/2019 | 9/18/2019 | 9/18/2019 10:14:16 AM | A | PASS |
|
|
Chris Phone #: ###-####.. plan reviewer recieved engineer letter.. filed to records
|
BLD19-03415
| BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 9:11:19 AM | A | DONE |
|
|
Phone #: ###-####// per plan,, appears that the p/l is 3 foot beyond fence
|
BLD19-03415
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 9:11:09 AM | P | PASS |
|
|
|
MIS19-00222
| BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 9:09:39 AM | A | DONE |
|
|
permit issued
|
MIS19-00222
| DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 9:09:21 AM | P | PASS |
|
|
|