Inspections for the day of: Thursday, September 19, 1996.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-01074 INSP - Conference9/19/19969/19/19969/19/1996 12:00:00 AM PASS
/ / 340 - CONF RE C/N OF 9-11 W/ GS
BLD96-01291 INSP - Framing/Rough-in9/19/19969/19/19969/19/1996 12:00:00 AM PART
/ / 340 - REINSP
BLD96-01299 INSP - Framing/Rough-in9/19/19969/19/19969/19/1996 12:00:00 AM FAIL
/ / 340 - NEED TO COMPLETE AIR SEAL & SEAL DRAFT STOP
BLD96-01817 INSP - Carpentry9/19/19969/19/19969/19/1996 12:00:00 AM PASS
/ / 340 - BLDG 3, NE CONF RM, GRID &SEISMIC OK, FRAME OK (AFTER ELEC..
BLD96-01944 INSP - Carpentry9/19/19969/19/19969/19/1996 12:00:00 AM PASS
/ / 340 - bldg 1, phase 1a; clg grid ok
BLD96-02492 INSP - Carpentry9/19/19969/19/19969/19/1996 12:00:00 AM FAIL
/ / 340 - NEED HANGERS AT JOISTS, DBL. RIM ACTING AS BEAM CN
BLD96-01245 INSP - Final9/18/19969/19/19969/19/1996 12:00:00 AMANR
09/18/96 340 - STRUCT OK, NEED PLBG & ELEC FINAL
BLD96-01291 INSP - Energy code compliance9/19/19969/19/19969/19/1996 12:00:00 AMPPART
09/19/96 340 - PART, TOLD TO REMOVE VAPOR BARRIER AT LID (POLY); OK TO C
BLD96-02034 INSP - Final9/18/19969/19/19969/19/1996 12:00:00 AMPFAIL
09/18/96 340 - NR, NEED LANDINGS
BLD96-01299 INSP - Energy code compliance9/19/19969/19/19969/19/1996 12:00:00 AMPFAIL
09/19/96 340 - NEED TO COMPLETE AIR SEAL; NR
BLD96-02492 INSP - Footings9/19/19969/19/19969/19/1996 12:00:00 AMPPASS
09/19/96 340 - HOLES FOR DECK
BLD96-00410 INSP - Framing/Rough-in9/18/19969/19/19969/19/1996 12:00:00 AMPNR
09/18/96 340 - NR