BLD01-00607
| BLD-Framing/Rough-in | 9/19/2001 | 9/19/2001 | 9/20/2001 12:00:00 AM | P | PART |
|
|
fr insp -dave shear 1st fl shear nailing ok 9/20/2001 10:15:12 AM...Still need eng's report/details re: shear wall sheathing not continuous to sills; question regarding stud size,spacing as per T23-IV-B. at brg walls 1st fl. 9/20/2001 10:24:27 AM
|
BLD00-01244
| BLD-Final | 9/13/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 09:36:14. Contact: ###-####....rec'd Hvac cfm report, ok 9/19/2001 3:43:06 PM
|
BLD01-00915
| BLD-Final | 9/13/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | A | PASS |
|
|
###-#### RICHARD
|
BLD01-02079
| BLD-Final | 9/18/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | A | FAIL |
|
|
###-#### DAVE...need fire final...ceiling or redo sprinklers?? 9/19/2001 9:53:18 AM
|
BLD01-00183
| BLD-Final | 9/18/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | A | PASS |
|
|
ok for l/c, elec & plbg ok per insp. record; struct final ok per 301... final 9/19/2001 11:37:59 AM
|
BLD00-01244
| BLD-Final | 9/18/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 340 On 9/18/2001 1:43:24 PM Jim ###-####
|
BLD01-00531
| BLD-Framing/Rough-in | 9/18/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 18:16:20. Contact: ###-####.
|
BLD01-02364
| BLD-Energy code compliance | 9/19/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | P | NR |
|
|
###-#### MARK; recall. 9/19/2001 4:35:52 PM
|
BLD01-00600
| BLD-Framing/Rough-in | 9/19/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | P | PART |
|
|
fr insp -dave shear 1st fl shear nailing ok. 9/20/2001 10:14:03 AM Still need eng's report re sheathing not to sill plates. 9/20/2001 10:21:48 AM
|
BLD01-01556
| BLD-Final | 9/19/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | P | FAIL |
|
|
###-####, c/n, fire alarm agreement to be in place, seal floor & shaft penetrations, etc. 9/19/2001 5:56:40 PM
|
BLD01-01920
| BLD-Conference | 9/19/2001 | 9/19/2001 | 9/19/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 9/19/2001 12:20:42 PM called owner ,explained c/n re shoring of roof.
|