FIR02-00299
| INSP-Final Inspection | 9/19/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | A | PASS |
|
|
fire alarm system finaled
|
FIR02-00285
| INSP-Final Inspection | 9/19/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | A | PASS |
|
|
fire alarm system finaled
|
FIR02-00321
| INSP-Alarm Testing | 9/18/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | A | FAIL |
|
|
provide verification that the 10ah batteries are OK to use, fix damper that won't close, relocate duct detector or first take off on hvac unit 9/19/2002 12:55:43 PM
|
FIR02-00340
| INSP-Sprinkler Rough-in | 9/18/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | A | FAIL |
|
|
rough-in of the overhead piping is ok. sprinklers need to be added in the storage space near the top of the stairs. No other items such as the riser or control valves under the floor have been looked at. 9/19/2002 3:16:43 PM 9/19/2002 3:16:59 PM
|
BLD02-01969
| FIRE-Final Inspection | 9/18/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | A | PART |
|
|
temporary occupancy given until the fire alarm system is inspected and finaled. FIre sprinkler and life safety OK 9/19/2002 9:00:55 AM
|
FIR02-00186
| INSP-Final Inspection | 9/19/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | P | PASS |
|
|
fire sprinkler system finaled
|
BLD02-01179
| FIRE-Final Inspection | 9/19/2002 | 9/19/2002 | 9/19/2002 12:00:00 AM | P | PART |
|
|
temporary occupancy given until the fire alarm system for the entire building has been upgraded. Per a letter to dave miller with the boise fire dept this is to be completed in 90 days
|