Inspections for the day of: Thursday, September 19, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00299 INSP-Final Inspection9/19/20029/19/20029/19/2002 12:00:00 AMAPASS
fire alarm system finaled
FIR02-00285 INSP-Final Inspection9/19/20029/19/20029/19/2002 12:00:00 AMAPASS
fire alarm system finaled
FIR02-00321 INSP-Alarm Testing9/18/20029/19/20029/19/2002 12:00:00 AMAFAIL
provide verification that the 10ah batteries are OK to use, fix damper that won't close, relocate duct detector or first take off on hvac unit 9/19/2002 12:55:43 PM
FIR02-00340 INSP-Sprinkler Rough-in9/18/20029/19/20029/19/2002 12:00:00 AMAFAIL
rough-in of the overhead piping is ok. sprinklers need to be added in the storage space near the top of the stairs. No other items such as the riser or control valves under the floor have been looked at. 9/19/2002 3:16:43 PM 9/19/2002 3:16:59 PM
BLD02-01969 FIRE-Final Inspection9/18/20029/19/20029/19/2002 12:00:00 AMAPART
temporary occupancy given until the fire alarm system is inspected and finaled. FIre sprinkler and life safety OK 9/19/2002 9:00:55 AM
FIR02-00186 INSP-Final Inspection9/19/20029/19/20029/19/2002 12:00:00 AMPPASS
fire sprinkler system finaled
BLD02-01179 FIRE-Final Inspection9/19/20029/19/20029/19/2002 12:00:00 AMPPART
temporary occupancy given until the fire alarm system for the entire building has been upgraded. Per a letter to dave miller with the boise fire dept this is to be completed in 90 days