Inspections for the day of: Friday, September 19, 2003.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01895 BLD-Conference9/17/20039/19/20039/19/2003 12:00:00 AMAFAIL
Need to issue stop work untill footing corection has been resolved. Jessie at housing is contact ###-####. 9/17/2003 11:59:08 PM issued stop work as prior c/n has not been resolved, posted prior c/n and stop work on window. 9/18/2003 8:08:09 PM
MEC03-02042 Rough-in9/18/20039/19/20039/19/2003 12:00:00 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Veronica Englandc/n 9/18/2003 5:47:39 PM
MEC03-02042 Pressure Test9/18/20039/19/20039/19/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Veronica England
MEC03-02548 Pressure Test9/18/20039/19/20039/19/2003 12:00:00 AMAPASS
left over see note under prior request. 9/18/2003 12:39:47 AM
MEC03-02548 Final9/18/20039/19/20039/19/2003 12:00:00 AMAFAIL
c/n posted. 9/18/2003 6:56:40 PM
BLD03-00655 BLD-Conference9/17/20039/19/20039/19/2003 12:00:00 AMACANC
Mike Perry ###-####. 9/17/2003 7:40:54 PM This has been doc . 9/18/2003 4:32:13 PM
BLD03-02024 BLD-Foundation9/18/20039/19/20039/19/2003 12:00:00 AMAPART
###-#### pour complete. 9/18/2003 5:10:09 PM
BLD03-01684 BLD-Framing/Rough-in9/18/20039/19/20039/19/2003 12:00:00 AMAPASS
EARNIE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD03-01688 BLD-Foundation9/18/20039/19/20039/19/2003 12:00:00 AMPCANC
CLAY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks clay called to canc this inspection not ready...dld
BLD03-01138 BLD-Framing/Rough-in9/18/20039/19/20039/19/2003 12:00:00 AMPCANC
rick; Phone #: ###-#### Internet Inspection Request from: Darla Downsout of time cloned 9/19/2003 12:41:57 AM
BLD03-01326 BLD-Framing/Rough-in9/18/20039/19/20039/19/2003 12:00:00 AMPCANC
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. out of time cloned . 9/19/2003 12:41:44 AM
BLD03-01326 BLD-Energy code compliance9/18/20039/19/20039/19/2003 12:00:00 AMPCANC
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreout of time cloned 9/19/2003 12:41:51 AM
BLD03-01107 BLD-Conference9/17/20039/19/20039/19/2003 12:00:00 AMPPART
Please meet with Jed and project engineer at 2:00pm with engineer. 9/17/2003 11:32:27 PM Went over job with engineer on site clairified items missing from approved plans. 9/19/2003 12:19:14 AM
BLD03-02092 BLD-Footing9/19/20039/19/20039/19/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/19/2003 at 7:19:51 AM. Contact: ###-####. pour complete unable to verify. note gave a c/n for retaining wall footing need to keep under 4 foot or permit required. soth side 9/19/2003 12:03:54 AM
BLD03-00748 BLD-Framing/Rough-in9/19/20039/19/20039/19/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 9/19/2003 at 8:28:23 AM. Contact: ###-####.still waiting for truss repair detail will get this them meet on site at next inspection. 9/19/2003 12:24:56 AM
BLD03-02046 BLD-Framing/Rough-in9/19/20039/19/20039/19/2003 12:00:00 AMPCANC
jay; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreout of time cloned 9/19/2003 12:42:03 AM
BLD03-01879 BLD-Framing/Rough-in9/19/20039/19/20039/19/2003 12:00:00 AMPCANC
MATT; Phone #: ###-#### Internet Inspection Request from: Marc Lileksout of time cloned 9/19/2003 12:42:09 AM
BLD03-00581 BLD-Final9/19/20039/19/20039/19/2003 12:00:00 AMPCANC
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore