FIR03-00241
| FIR-Aging Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | | NR |
|
|
wip 9/19/2003 9:09:59 AM
|
BLD03-01116
| FIRE-Final Inspection | 9/18/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | PART |
|
|
temporary occupancy given with dave millers permission until the fire alarm plans are complete and finaled 9/19/2003 9:59:49 AM
|
FIR03-00462
| INSP-Sprinkler Rough-in/Hydro | 9/18/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | FAIL |
|
|
The inspection was for tenting. Tenting on the first floor can be pushed off of the sprinkler piping in several locations. Not all tenting was inspected. All tenting to be looked at re-inspection 9/19/2003 11:17:11 AM
|
FIR03-00480
| INSP-Sprinkler Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | PART |
|
|
Inspection was for the hangers for the 3" main in the west side of the new building. They are OK. Also inspected was the 2 1/2" main and drop downs on the west side holding cells 9/19/2003 4:14:54 PM
|
MIS03-00181
| FIR-Final | 9/18/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | PART |
|
|
A temporary occupancy was given until the sprinkler pendant is relocated, the exit sign repaired, fire extinguishers provided and the door to remain unlocked sticker is installed. Per the MIS documents a temp is permissable 9/19/2003 9:00:43 AM
|
FIR03-00423
| INSP-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | PART |
|
|
temp given until the sprinkler pendant is relocated at the kitchen hood
|
FIR03-00194
| INSP-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | FAIL |
|
|
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
|
BLD02-02604
| FIRE-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | A | FAIL |
|
|
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
|
FIR03-00337
| INSP-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00133
| INSP-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-01116
| FIRE-Final Inspection | 9/18/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | P | CANC |
|
|
duplicate inspection. Project was given a temp in the morning. 9/19/2003 4:19:46 PM
|
FIR03-00347
| INSP-Sprinkler Rough-in/Hydro | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | P | CANC |
|
|
Inspection was for 24 hour air test for the dry pipe system. Contractor wanted a witness for the finish of the test. I told them someone needed to witness the start of the test. They will do it over starting monday 9/19/2003 4:17:34 PM
|
BLD03-00334
| FIRE-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | P | PASS |
|
|
fire life safety, fire alarm and fire sprinkler finaled 9/19/2003 1:00:00 PM
|
FIR03-00245
| INSP-Final Inspection | 9/17/2003 | 9/19/2003 | 9/19/2003 12:00:00 AM | P | FAIL |
|
|
Provide map per review note #15, provide smoke detector in office per Roger Gurkey, Provide signs per review note #28 9/19/2003 4:21:14 PM
|