Inspections for the day of: Friday, September 19, 2003.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00241 FIR-Aging Inspection9/19/20039/19/20039/19/2003 12:00:00 AM NR
wip 9/19/2003 9:09:59 AM
BLD03-01116 FIRE-Final Inspection9/18/20039/19/20039/19/2003 12:00:00 AMAPART
temporary occupancy given with dave millers permission until the fire alarm plans are complete and finaled 9/19/2003 9:59:49 AM
FIR03-00462 INSP-Sprinkler Rough-in/Hydro9/18/20039/19/20039/19/2003 12:00:00 AMAFAIL
The inspection was for tenting. Tenting on the first floor can be pushed off of the sprinkler piping in several locations. Not all tenting was inspected. All tenting to be looked at re-inspection 9/19/2003 11:17:11 AM
FIR03-00480 INSP-Sprinkler Rough-in9/18/20039/19/20039/19/2003 12:00:00 AMAPART
Inspection was for the hangers for the 3" main in the west side of the new building. They are OK. Also inspected was the 2 1/2" main and drop downs on the west side holding cells 9/19/2003 4:14:54 PM
MIS03-00181 FIR-Final9/18/20039/19/20039/19/2003 12:00:00 AMAPART
A temporary occupancy was given until the sprinkler pendant is relocated, the exit sign repaired, fire extinguishers provided and the door to remain unlocked sticker is installed. Per the MIS documents a temp is permissable 9/19/2003 9:00:43 AM
FIR03-00423 INSP-Final Inspection9/19/20039/19/20039/19/2003 12:00:00 AMAPART
temp given until the sprinkler pendant is relocated at the kitchen hood
FIR03-00194 INSP-Final Inspection9/19/20039/19/20039/19/2003 12:00:00 AMAFAIL
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
BLD02-02604 FIRE-Final Inspection9/19/20039/19/20039/19/2003 12:00:00 AMAFAIL
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
FIR03-00337 INSP-Final Inspection9/19/20039/19/20039/19/2003 12:00:00 AMPPASS
FIR03-00133 INSP-Final Inspection9/19/20039/19/20039/19/2003 12:00:00 AMPPASS
BLD03-01116 FIRE-Final Inspection9/18/20039/19/20039/19/2003 12:00:00 AMPCANC
duplicate inspection. Project was given a temp in the morning. 9/19/2003 4:19:46 PM
FIR03-00347 INSP-Sprinkler Rough-in/Hydro9/19/20039/19/20039/19/2003 12:00:00 AMPCANC
Inspection was for 24 hour air test for the dry pipe system. Contractor wanted a witness for the finish of the test. I told them someone needed to witness the start of the test. They will do it over starting monday 9/19/2003 4:17:34 PM
BLD03-00334 FIRE-Final Inspection9/19/20039/19/20039/19/2003 12:00:00 AMPPASS
fire life safety, fire alarm and fire sprinkler finaled 9/19/2003 1:00:00 PM
FIR03-00245 INSP-Final Inspection9/17/20039/19/20039/19/2003 12:00:00 AMPFAIL
Provide map per review note #15, provide smoke detector in office per Roger Gurkey, Provide signs per review note #28 9/19/2003 4:21:14 PM