BLD07-01219
| BLD-Aging Inspection | 9/19/2007 | 9/19/2007 | 9/27/2007 1:13:58 PM | | NR |
|
|
|
BLD07-01011
| BLD-Aging Inspection | 9/19/2007 | 9/19/2007 | 9/27/2007 1:12:53 PM | | NR |
|
|
|
MIS06-00008
| MIS-Aging Inspection | 9/19/2007 | 9/19/2007 | 9/27/2007 1:08:50 PM | | CANC |
|
|
|
BLD06-00697
| BLD-Final | 9/19/2007 | 9/19/2007 | 9/19/2007 5:47:56 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 9:04:12 AM. Contact: ###-####. Needs other finals.
|
BLD07-01698
| BLD-Final | 9/18/2007 | 9/19/2007 | 9/19/2007 3:53:53 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/18/2007 at 12:28:13 PM. Contact: ###-####. Needs mech. final first.
|
BLD06-03399
| BLD-Final | 9/18/2007 | 9/19/2007 | 9/19/2007 3:15:03 PM | P | NR |
|
|
john Phone #: ###-####. Needs code enforcement sign off.
|
BLD07-01290
| BLD-Final | 9/19/2007 | 9/19/2007 | 9/19/2007 2:56:45 PM | P | FAIL |
|
|
ryan - please call 1/2 hr prior to inspection Phone #: ###-####. Needsbto install SD upstairs in R3 occ. as per approved plan.
|
BLD07-02370
| BLD-Framing/Rough-in | 9/19/2007 | 9/19/2007 | 9/19/2007 2:33:57 PM | P | PART |
|
|
peter Phone #: ###-#### Note: call 1/2 hr prior to inspection. Still needs mech ri insp. Needs to fireblock furouts and ceiling at crawl. Also noted that egress window is to high, may build permanant step. Will call for another insp. after fireblocking is complete.
|
BLD07-00599
| BLD-Framing/Rough-in | 9/19/2007 | 9/19/2007 | 9/19/2007 11:07:33 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: paul thornton. Complete firestop at sprinkler line penetrations, and floor ceiling penetrations, provide approved UL listed collar assembly for B vent at floor ceiling penetration. Complete lateral bracing, provide putty pads on elec. boxes were needed. repair tub drain penetration. pending fire ri insp. c/n posted.
|
BLD07-02336
| BLD-Footing | 9/18/2007 | 9/19/2007 | 9/19/2007 10:48:09 AM | A | PART |
|
|
pouring at 11- ryan webster- ###-#### or robert mcpherson . wip, installing chairs for reinforcement.
|