Inspections for the day of: Friday, September 19, 2008.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01294 FIRE-Final Inspection9/18/20089/19/20089/19/2008 5:03:28 PMAPART
The sixth floor was given a temporary for the life safety with sam rogers permission until the fire alarm issues have been taken care of and the two conference rooms which are already in the process of remodeling are done and life safety items verified.
FIR08-00523 INSP-Alarm Testing9/18/20089/19/20089/19/2008 5:01:03 PMPPART
A temporary occupancy was given for the sixth floor with sam rogers permission until the vesda interconnections have been tested and the induct detectors have been correctly oriented as per sams and chris's telephone conversation.
FIR08-00551 INSP-Sprinkler Rough-in/Hydro9/19/20089/19/20089/19/2008 4:55:49 PMPCANC
Could not make the inspection due to time constraints.
FIR08-00266 INSP-Alarm Testing9/19/20089/19/20089/19/2008 3:58:31 PMPPASS
Permit finaled
BLD08-01351 FIRE-Final Inspection9/18/20089/19/20089/19/2008 8:35:56 AMAPASS
fire life safety passed