BLD08-01294
| FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 5:03:28 PM | A | PART |
|
|
The sixth floor was given a temporary for the life safety with sam rogers permission until the fire alarm issues have been taken care of and the two conference rooms which are already in the process of remodeling are done and life safety items verified.
|
FIR08-00523
| INSP-Alarm Testing | 9/18/2008 | 9/19/2008 | 9/19/2008 5:01:03 PM | P | PART |
|
|
A temporary occupancy was given for the sixth floor with sam rogers permission until the vesda interconnections have been tested and the induct detectors have been correctly oriented as per sams and chris's telephone conversation.
|
FIR08-00551
| INSP-Sprinkler Rough-in/Hydro | 9/19/2008 | 9/19/2008 | 9/19/2008 4:55:49 PM | P | CANC |
|
|
Could not make the inspection due to time constraints.
|
FIR08-00266
| INSP-Alarm Testing | 9/19/2008 | 9/19/2008 | 9/19/2008 3:58:31 PM | P | PASS |
|
|
Permit finaled
|
BLD08-01351
| FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 8:35:56 AM | A | PASS |
|
|
fire life safety passed
|