Inspections for the day of:
Friday, September 19, 2008
.
Number of inspections:
22
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC08-00183
BMP Violation
9/15/2008
9/19/2008
9/19/2008 5:39:22 PM
P
FAIL
Notice of correction. Left a message with the RP
1. put in perimeter control where need that lots slope towards street.
2. Protect stock pile with erosion control or a sediment barrier.
3. Get approved storm drain protection in the interior storm drain of the project. Clean up all sediment and debris off of all hardsurfaces.
Failure to comply will result in a Stop work order.
Will re-inspect 9/22/08 in the PM.
ESC08-00179
BMP Violation
9/19/2008
9/19/2008
9/19/2008 4:23:05 PM
P
CANC
ESC08-00179
BMP Violation
9/19/2008
9/19/2008
9/19/2008 4:17:15 PM
P
PART
Have begun to address the issues with the prior inspections.
Notice of Correction.
1. Need to complete the perimeter gaurd surounding the stock pile at the south east end of the project.
Need to add in stakes in the wattle at the west end of project per manufacturors specs.
Install secondary protection or block off storm drain at the south end of the stock pile.
Will re-inspect on 9/22/08
Failure to comply will result in further enforcment.
ESC08-00444
Site Final
9/19/2008
9/19/2008
9/19/2008 3:17:29 PM
P
PASS
ESC04-00776
Site Final
9/18/2008
9/19/2008
9/19/2008 2:50:35 PM
A
PASS
ESC08-00504
Random Inspection
9/19/2008
9/19/2008
9/19/2008 2:33:50 PM
P
PASS
ESC05-00229
Site Final
9/18/2008
9/19/2008
9/19/2008 1:30:38 PM
A
PASS
ESC04-00404
Site Final
9/19/2008
9/19/2008
9/19/2008 1:30:24 PM
P
PASS
ESC04-00703
Site Final
9/19/2008
9/19/2008
9/19/2008 1:29:31 PM
P
PASS
ESC03-00827
Site Final
9/19/2008
9/19/2008
9/19/2008 1:28:56 PM
P
PASS
ESC05-00264
Site Final
9/19/2008
9/19/2008
9/19/2008 1:28:29 PM
P
PASS
ESC04-01238
Site Final
9/18/2008
9/19/2008
9/19/2008 1:27:02 PM
A
PASS
ESC05-01601
Site Final
9/18/2008
9/19/2008
9/19/2008 1:25:55 PM
A
PASS
ESC06-00776
Site Final
9/19/2008
9/19/2008
9/19/2008 1:25:38 PM
P
PASS
ESC07-01547
BMP Violation
9/19/2008
9/19/2008
9/19/2008 1:23:21 PM
P
FAIL
Left message with Doug Cleagy RP for hte project itll Corey gets back on the 29th of Sept.
1. Need to install perimeter protection on the Mcmillian and five mile side where the slope are higher that 2% grade.
Clean all D.I.'s within the project and along the perimter of the project.
Will re-inspect on 9/22/08
ESC08-00717
General Inspection
9/11/2008
9/19/2008
9/19/2008 11:37:39 AM
A
PART
ESC08-00772
Site Preparation
9/11/2008
9/19/2008
9/19/2008 10:44:44 AM
A
PART
Neec to protect the storm drains within the parking lot of the building.
CAS
ESC04-01100
Site Final
9/18/2008
9/19/2008
9/19/2008 10:19:11 AM
A
PASS
ESC08-00342
BMP Violation
9/16/2008
9/19/2008
9/19/2008 10:17:00 AM
A
PASS
ESC08-00774
Site Preparation
9/12/2008
9/19/2008
9/19/2008 10:01:11 AM
A
PASS
ESC08-00461
General Inspection
9/19/2008
9/19/2008
9/19/2008 9:41:07 AM
DONE
No activity on site.
ESC08-00491
Conference
9/19/2008
9/19/2008
9/19/2008 9:20:30 AM
A
DONE