FIR11-00477
| INSP-Final Inspection | 9/16/2011 | 9/19/2011 | 9/19/2011 4:19:07 PM | A | FAIL |
|
|
All items tested ok except the interconnection of wires run between the buildings. The circuits were not installed in metalic conduit as per the redlined plans, but instead in PVC. After confiring with Doug Poedy it was clear in both NFPA 72 and NEC that the only options for the interbuilding fire alarm circuiting are: provide a metalic cable shield (grounded to the building electrode system), run in metalic conduit (grounded to the building electrode system), or provide isolation modules. Items also needing addressed are the descriptions for the HVAC units in the records storage building.
|
BLD11-00781
| FIRE-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:19:47 PM | P | FAIL |
|
|
Life safety will be ok to final when the project related fire alarm permit has been passed.
|
BLD11-00380
| FIRE-Final Inspection | 9/16/2011 | 9/19/2011 | 9/19/2011 3:19:02 PM | A | FAIL |
|
|
Provide lever hardware on the office and kitchen restroom doors, remove the dead bolt from the office door, mount fire extinguishers and remove the palm fronds that are blocking the sidewall sprinkler heads in the seating area.
|
FIR11-00366
| INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:17:41 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00366
| INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:16:58 PM | P | PASS |
|
|
Permit finaled. Forward flush passed
|
FIR11-00419
| INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:16:19 PM | P | PASS |
|
|
permit finaled
|
FIR11-00362
| INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:15:50 PM | P | PASS |
|
|
permit finaled
|
FIR11-00349
| INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:15:28 PM | P | PASS |
|
|
Permit finaled
|
BLD11-01985
| FIRE-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 3:15:02 PM | P | FAIL |
|
|
Need the cross access agreement, provide building address, provide fire extinguisher, provide knox box and remove the thumbturn locks.
|
FIR11-00475
| INSP-Final Inspection | 9/16/2011 | 9/19/2011 | 9/19/2011 2:33:27 PM | A | PASS |
|
|
Permit finaled.
|
FIR11-00330
| INSP-Sprinkler Rough-in/Hydro | 9/16/2011 | 9/19/2011 | 9/19/2011 10:56:26 AM | A | PASS |
|
|
24 hour air test started at 8:30 am with 43 1/2 psi on the guage.
|