FIR11-00344
| FIR-Aging Inspection | 9/19/2012 | 9/19/2012 | 9/24/2012 1:23:26 PM | | NR |
|
|
Per Art and Dave with ADT this work was never performed and they are going to void the permit.
|
BLD12-01722
| FIRE-Final Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 3:46:47 PM | P | PASS |
|
|
life safety passed
|
BLD12-00761
| FIRE-Final Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 3:41:36 PM | P | PASS |
|
|
Life safety passed.
|
FIR12-00280
| INSP-Final Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 3:18:22 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00518
| INSP-Final Inspection | 9/18/2012 | 9/19/2012 | 9/19/2012 2:36:55 PM | A | FAIL |
|
|
Inspection was actually for a rough to cover. Sprinkler piping can be covered and a final inspection can be called for when the ceiling tile has been installed.
|
BLD12-02427
| FIRE-Final Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 2:17:14 PM | P | PASS |
|
|
Life safety passed. The exit signs/emergency lights repaired as I waited.
|
FIR12-00280
| INSP-Final Inspection | 9/17/2012 | 9/19/2012 | 9/19/2012 12:06:54 PM | A | FAIL |
|
|
Provide the correct as-builts, updated map and the correct NFPA 72 record of completion forms.
|