Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00639 INSP-Sprinkler Rough-in9/18/20139/19/20139/23/2013 3:42:56 PMANR
FIR13-00458 INSP-Sprinkler Rough-in9/19/20139/19/20139/19/2013 3:55:19 PMPPART
Overhead work at the grid ceilings approved for cover.
FIR13-00432 INSP-Sprinkler Rough-in9/19/20139/19/20139/19/2013 3:54:30 PMPPART
IBR only okayed for cover
BLD06-02323 FIRE-Final Inspection9/18/20139/19/20139/19/2013 3:53:25 PMAPART
Building #2 unit #405 passed fire life safety inspection.
BLD13-01690 FIRE-Final Inspection9/18/20139/19/20139/19/2013 10:29:38 AMANR
Noted items include; missing fire extinguishers, need to repair EM lights, provide hardware at the main entry/exit as discussed, reverse hardware at the back excersise room exit door, post max. occupant signage.
FIR13-00266 INSP-Final Inspection9/18/20139/19/20139/19/2013 10:09:44 AMACANC
Need trip test and Final sprinkler system inspection. Please contact Richard Clark ###-#### for questions. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
BLD13-02302 FIRE-Final Inspection9/18/20139/19/20139/19/2013 9:48:10 AMAPASS
Life safety inspection completed acceptable.
FIR13-00319 INSP-Sprinkler Rough-in9/18/20139/19/20139/19/2013 9:46:52 AMAPART
Overhead work at the grid ceilings okay for cover. Need as-built plans reflecting actual branchline and main locations. Also need to remove one existing pendent exceeding min. separation from new heads at the workroom.