GCE13-00137
| GCE-Permanent Service | 9/19/2013 | 9/19/2013 | 9/19/2013 2:24:26 PM | P | PASS |
|
|
Restart service. ###-####. P/S Connect ok.
|
GCE13-00137
| GCE-Final | 9/19/2013 | 9/19/2013 | 9/19/2013 2:23:55 PM | P | PASS |
|
|
Restart service. ###-####. Contractor stated he would test everything after energizing.
|
ELE13-02602
| Temporary Service | 9/19/2013 | 9/19/2013 | 9/19/2013 1:47:07 PM | P | PASS |
|
|
Temp pole Phone #: ###-#### >> Inspection requested via web by TOM BICANDI. T/S Connect ok.
|
ELE13-02599
| Rough-In Permanent Service | 9/19/2013 | 9/19/2013 | 9/19/2013 1:46:16 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by TOM BICANDI. P/S Connect ok. Ok to cover.
|
GCE13-00153
| GCE-Final | 9/19/2013 | 9/19/2013 | 9/19/2013 1:16:04 PM | P | NH |
|
|
Pat ###-####
|
GCE13-00151
| GCE-Permanent Service | 9/19/2013 | 9/19/2013 | 9/19/2013 12:14:19 PM | A | FAIL |
|
|
Call Robert for access ###-####. No underground conduit inspection, conduit must be exposed for inspection, Need straps within 3 ft of boxes. The ground can not be the first secure point.
|