ELE12-02889
| Electrical Rough-In | 9/19/2014 | 9/19/2014 | 9/19/2014 2:42:08 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by patrick marks called to see about access, nh, will re-schedule for next week
|
ELE14-02620
| Electrical Rough-In | 9/19/2014 | 9/19/2014 | 9/19/2014 2:36:24 PM | P | PASS |
|
|
Please call before arrival to ensure access. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown ri ok
|
ELE14-01812
| Electrical Rough-In | 9/18/2014 | 9/19/2014 | 9/19/2014 1:24:52 PM | P | PASS |
|
|
Rough-in inspection for IL area "B" 4th floor rooms: B401, B403, B404, B405, B406, B407, B409, ; Corridor B451. Call Fabian when on-site ###-####, if no answer call Lonny ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ri ok as called for
|
ELE14-00938
| Final | 9/19/2014 | 9/19/2014 | 9/19/2014 12:03:05 PM | P | PASS |
|
|
Auto Phone #: ###-#### corrections made, ok final
|
ELE14-02622
| Final | 9/18/2014 | 9/19/2014 | 9/19/2014 10:47:16 AM | A | PASS |
|
|
Robert Phone #: ###-#### ok final
|
ELE14-02626
| Temporary Service | 9/18/2014 | 9/19/2014 | 9/19/2014 9:57:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by HZ ZAHIC t/s o/h n ok
|
ELE14-00938
| Final | 9/18/2014 | 9/19/2014 | 9/19/2014 9:09:06 AM | A | FAIL |
|
|
Otto Phone #: ###-#### called, left correction notice, NEC 210.52 shall install receptacle above counter-top by door, rest ok
|
ELE14-02360
| Final | 9/19/2014 | 9/19/2014 | 9/19/2014 8:06:57 AM | A | PASS |
|
|
###-#### ok final
|
ELE14-02623
| Rough-In Permanent Service | 9/18/2014 | 9/19/2014 | 9/19/2014 6:50:48 AM | A | CANC |
|
|
Any questions please let me know, thx, TW. Phone #: ###-#### >> Inspection requested via web by Stephen Kren Inspection cancelled from web by: Stephen Kren
|