FIR14-00627
| INSP-Sprinkler Rough-in | 9/19/2014 | 9/19/2014 | 9/19/2014 4:42:07 PM | P | PART |
|
|
Okay to cover remainder of fire sprinkler work at the grid ceilings within the tenant remodel area.
|
FIR14-00672
| INSP-Final Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 3:57:08 PM | P | NR |
|
|
Project not in condition for final at this time.
|
BLD14-02340
| FIRE-Final Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 3:44:25 PM | P | PASS |
|
|
Fire life safety inspection passed. No signature card available on site.
|
FIR14-00594
| INSP-Final Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 3:43:02 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection.
|
FIR14-00571
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/19/2014 | 9/19/2014 3:39:37 PM | A | PART |
|
|
Okayed for cover fire sprinkler modifications at the grid ceilings SE open office and new room areas as marked/dated on approved plans.
|
FIR14-00672
| INSP-Sprinkler Rough-in | 9/19/2014 | 9/19/2014 | 9/19/2014 3:03:14 PM | P | PART |
|
|
Verified removal of the cooler and dry pendent. New ssp installed but missing grid and ceiling at this time. No access to complete inspection of work at the basement.
|
FIR14-00344
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/19/2014 | 9/19/2014 11:55:47 AM | A | PART |
|
|
Verified corrections and adjustments for the wet system as noted 3rd floor north end building area C. Okayed for cover at four units- * need to verify insulation fill at two locations, discussed documentation for changes to install vs. approved plan.
|
FIR14-00604
| INSP-Sprinkler Rough-in | 9/18/2014 | 9/19/2014 | 9/19/2014 11:50:46 AM | A | PART |
|
|
Field verified previous correction items noted for the dry system 3rd floor building C.
|