ESC14-00296
| General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 3:40:49 PM | | PART |
|
|
trackout occuring. contractor to do a more detailed sweeping job during construction
|
ESC11-00192
| General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 1:59:42 PM | | PASS |
|
|
only vertical construction taking place at this time. no esc issues at this time
|
ESC14-00256
| General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 11:43:41 AM | | PART |
|
|
hillside needs to be addressed from previous erosion
|
ESC14-00250
| General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 11:42:08 AM | | PASS |
|
|
no esc issues
|
ESC14-00299
| General Inspection | 9/17/2014 | 9/19/2014 | 9/19/2014 11:31:40 AM | A | FAIL |
|
|
No Perimeter BMP's installed, nor permit posted. Corrections: 1.) Install BMP's per site Plan 2.) Post Permit onsite in visible area
|
ESC14-00458
| Site Preparation | 9/18/2014 | 9/19/2014 | 9/19/2014 11:14:25 AM | A | PASS |
|
|
no esc issues at this time. General Inspection
|
ESC14-00267
| General Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 10:31:31 AM | A | PART |
|
|
Drop Inlet Protection on 6th St. Needs to be replaced. Also, during all saw cutting or concrete drilling, contractors to utilize water to reduce airborn durn during cutting. Called Bruce and left VM disclosing both issues. I have noticed on a few occassions a significant plume of concrete dust leaving construction areas.
|
ESC14-00303
| General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 9:20:38 AM | | FAIL |
|
|
Significant Erosion taking place on entrance road. No Stabilization practices have been applied on any disturbed slopes and erosion taking place throughout project. Contacted Shane Hopkins disclosing concerns or road washing out and lack or stabilization and no erosion control practices have occured yet.
|
ESC14-00483
| General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 8:50:56 AM | | FAIL |
|
|
Permit not posted long stockpile unprotected along west side of site that needs protection or backfilled prior to end of today due to expected rains over the weekend. Contacted RP and disclosed issues. He stated he will post permit and figure out what's going on with stockpile. he said it wasn't part of his project, but it appears the west side wall will either be extended out, or new sidewalk and curb is being installed. he stated he will give me a call back with more information about that portion of the project.
|
ESC13-01224
| General Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 8:21:51 AM | P | PASS |
|
|
see final
|
ESC13-01224
| DOC - Permit Finaled | 9/19/2014 | 9/19/2014 | 9/19/2014 8:21:35 AM | P | PASS |
|
|
project complete no esc issues
|