FIR16-00502
| INSP-Sprinkler Rough-in | 9/19/2016 | 9/19/2016 | 9/19/2016 3:45:43 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered. Not all of the walls have been installed yet so final pendant head spacing can not be verified yet.
|
FIR16-00441
| INSP-Sprinkler Rough-in | 9/16/2016 | 9/19/2016 | 9/19/2016 2:11:44 PM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered. Riser has not been built yet. Need as-builts showing the pipe routing changes. Fitting counts are the same
|
FIR16-00444
| INSP-Sprinkler Rough-in | 9/16/2016 | 9/19/2016 | 9/19/2016 2:07:56 PM | P | CANC |
|
|
Joseph Danes and I agreed to inspect this when the tenting has been installed.
|
FIR16-00577
| INSP-Final Inspection | 9/16/2016 | 9/19/2016 | 9/19/2016 1:33:16 PM | P | FAIL |
|
|
Provide as-builts showing the correct communicator (DSC), provide breaker lock and breaker description on the schedule with-in the breaker panel, provide knox key box per review note #13 (Building is a separate fire alarm system from main school).
|
BLD16-00922
| FIRE-Final Inspection | 9/16/2016 | 9/19/2016 | 9/19/2016 9:19:00 AM | A | PASS |
|
|
Life safety passed
|
BLD16-01225
| FIRE-Final Inspection | 9/19/2016 | 9/19/2016 | 9/19/2016 8:38:39 AM | P | PASS |
|
|
Life safety passed. Exit discharge light repaired.
|
BLD16-01225
| FIRE-Final Inspection | 9/16/2016 | 9/19/2016 | 9/19/2016 8:16:31 AM | A | FAIL |
|
|
The north exit discharge light did not operate
|