Inspections for the day of: Monday, September 19, 2016.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF16-00023 INSP-Sprinkler Rough-in/Hydro9/19/20169/19/20169/19/2016 2:47:10 PMPPART
24 hour air test on dry system, 43.5 psi @ 2pm on 9/19/16

-Verified the rest of the dry pipe system, missing two seismic braces at elbow to canopy.
- Verified drop ceiling coverage 2nd flr in conference room and center office space, a room was added to the west side of this space and messed up sprinkler coverage(plans noted)
-Drop ceiling for hallway in front of elevator and apartments on 2nd flr still pending.
-Coverage in operating rooms 1st flr, uprights were added, "OK"