NAF16-00023
| INSP-Sprinkler Rough-in/Hydro | 9/19/2016 | 9/19/2016 | 9/19/2016 2:47:10 PM | P | PART |
|
|
24 hour air test on dry system, 43.5 psi @ 2pm on 9/19/16
-Verified the rest of the dry pipe system, missing two seismic braces at elbow to canopy. - Verified drop ceiling coverage 2nd flr in conference room and center office space, a room was added to the west side of this space and messed up sprinkler coverage(plans noted) -Drop ceiling for hallway in front of elevator and apartments on 2nd flr still pending. -Coverage in operating rooms 1st flr, uprights were added, "OK"
|