PLM17-01594
| Final | 9/19/2017 | 9/19/2017 | 9/19/2017 3:18:52 PM | P | PASS |
|
|
Access: Key in magnet box on electric panel Any questions call Nikki ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-03564
| Water Softner Final | 9/19/2017 | 9/19/2017 | 9/19/2017 3:18:37 PM | P | PASS |
|
|
PLEASE CALL BEFORE ARRIVAL Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM17-03550
| Water Softner Final | 9/19/2017 | 9/19/2017 | 9/19/2017 3:10:02 PM | P | PASS |
|
|
|
PLM17-03550
| DOC - Permit Expired | 9/19/2017 | 9/19/2017 | 9/19/2017 3:09:53 PM | P | PASS |
|
|
|
PLM17-03185
| Plumbing Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 3:07:33 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Test on water fail
|
PLM16-03055
| Plumbing Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 2:45:34 PM | P | PASS |
|
|
Waters on second floor stub outs for main Roof drains Overflow drains 2- 4" vents from garage to roof Phone #: ###-#### Inspection requested via web by wes Ritchie-Water stub outs, roof drains and over flows and garage vents pass.
|
PLM17-03546
| Plumbing Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 2:17:36 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Samuel Drake-In wall ok
|
MEC17-02771
| Final | 9/15/2017 | 9/19/2017 | 9/19/2017 1:52:58 PM | P | PASS |
|
|
Just look at correction outside. We are repairing in AM Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM17-03547
| Plumbing Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 1:43:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM17-03411
| Groundwork | 9/18/2017 | 9/19/2017 | 9/19/2017 1:27:13 PM | P | PASS |
|
|
at Noon. if questions please contact Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-03493
| Groundwork | 9/18/2017 | 9/19/2017 | 9/19/2017 12:08:23 PM | A | PART |
|
|
Ground work stubbed into the building drainage only. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Sewer stub into building pass.
|
PLM17-03564
| Sprinkler (Final) | 9/18/2017 | 9/19/2017 | 9/19/2017 11:00:35 AM | A | CANC |
|
|
PLEASE CALL BEFORE ARRIVAL Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM17-03548
| Water Heater Final | 9/18/2017 | 9/19/2017 | 9/19/2017 10:56:11 AM | A | PASS |
|
|
INSTALLED (2) WATER HEATERS AT THE CLUBHOUSE. SEE LADONNA ONSITE ###-#### CALL HER WHEN ON WAY. SHE WOULD LIKE AN AM INSPECTION IF POSSIBLE. Phone #: ###-#### Inspection requested via web by ron pierce
|
PLM17-02297
| Plumbing Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 10:25:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM17-03072
| Groundwork | 9/18/2017 | 9/19/2017 | 9/19/2017 10:22:54 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige-Stainless steel venting for interceptor was installed by other then the plumbing contractor. The stainless steel is not approved for DWV. Remove and replace with approved matreial. Start of 24 hr tes on fuel interceptor.
|
PLM17-02297
| Groundwork | 9/18/2017 | 9/19/2017 | 9/19/2017 8:42:38 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by David Stephenson
|
MEC17-02581
| Final | 9/18/2017 | 9/19/2017 | 9/19/2017 8:29:47 AM | A | PASS |
|
|
Will Phone #: ###-####
|
MEC17-04179
| Pressure Test | 9/18/2017 | 9/19/2017 | 9/19/2017 8:11:57 AM | A | PASS |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
PLM16-03106
| PLM-Aging Inspection | 9/19/2017 | 9/19/2017 | 9/19/2017 6:24:12 AM | | PART |
|
|
No calls
|