FIR16-00267
| INSP-Sprinkler Rough-in/Hydro | 9/18/2017 | 9/19/2017 | 9/20/2017 11:57:42 AM | A | PART |
|
|
Rough to cover inspection for level 6 complete, level 6 approved for cover. Hydrostatic test for all of level 6 complete.
|
FIR17-00396
| INSP-Final Inspection | 9/19/2017 | 9/19/2017 | 9/19/2017 1:17:32 PM | P | PASS |
|
|
Final fire sprinkler inspection for area of work passed/complete.
|
FIR17-00380
| INSP-Final Inspection | 9/18/2017 | 9/19/2017 | 9/19/2017 1:17:03 PM | A | PASS |
|
|
Final fire alarm inspection for area of work complete
|
FIR17-00382
| INSP-Final Inspection | 9/18/2017 | 9/19/2017 | 9/19/2017 1:16:44 PM | A | PASS |
|
|
Final fire alarm inspection for area of work complete
|
FIR17-00547
| INSP-Final Inspection | 9/19/2017 | 9/19/2017 | 9/19/2017 9:50:29 AM | P | CANC |
|
|
Inspection request cancelled per conversation with Matt, Phone #: ###-#### Inspection will be rescheduled for a later date.
|
FIR16-00194
| INSP-Sprinkler Rough-in/Hydro | 9/18/2017 | 9/19/2017 | 9/19/2017 9:27:13 AM | A | PART |
|
|
24 hour air test started at 0845 on 19SEPT2017, level 1 dry system at 43 psi, level 2 dry system at 42 psi
|
FIR16-00090
| INSP-Sprinkler Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 9:23:07 AM | A | PASS |
|
|
Fire pump start up/flow test complete.
|
FIR16-00299
| INSP-Sprinkler Rough-in/Hydro | 9/18/2017 | 9/19/2017 | 9/19/2017 9:22:19 AM | A | CANC |
|
|
Inspection request was for fire pump start up, fire pump is under FIR16-00090, this request is cancelled.
|
FIR16-00040
| INSP-Final Inspection | 9/18/2017 | 9/19/2017 | 9/19/2017 9:20:37 AM | A | PASS |
|
|
Final inspection for underground supply passed/complete.
|
FIR16-00194
| INSP-Sprinkler Rough-in/Hydro | 9/18/2017 | 9/19/2017 | 9/18/2017 2:16:12 PM | A | CANC |
|
|
24 hour air test Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|