Inspections for the day of: Wednesday, September 19, 2018.
Number of inspections: 29
Percentage of inspections complete: 97 %
Percentage of inspections not complete: 3 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03631 BLD-Final9/19/20189/19/20189/19/2018 3:35:42 PMPNR
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. Needs public works final and final letter from special inspection agency.
BLD17-03632 BLD-Final9/19/20189/19/20189/19/2018 3:35:08 PMPPEND
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. Need final inspection letter from special inspection agency.
BLD17-03630 BLD-Final9/19/20189/19/20189/19/2018 3:34:29 PMPNR
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. Needs public works final and final letter from special inspection agency.
BLD18-03227 BLD-Final9/18/20189/19/20189/19/2018 2:47:16 PMPDONE
Phone #: ###-#### Inspection requested via web by Hans Weikl
BLD18-03227 DOC - Permit Finaled9/19/20189/19/20189/19/2018 2:47:06 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD18-00400 FIRE-Final Inspection9/19/20189/19/20189/19/2018 2:39:24 PMPPASS
Fedor Phone #: ###-####. Life/safety final ok.
BLD18-02530 BLD-Final9/19/20189/19/20189/19/2018 1:24:18 PMPPASS
Ok for perm occ.
BLD18-02530 FIRE-Final Inspection9/19/20189/19/20189/19/2018 1:23:59 PMPPASS
All issues have been resolved.
BLD16-04488 BLD-Final9/19/20189/19/20189/19/2018 12:48:07 PMPPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04488 DOC - Permit Finaled9/19/20189/19/20189/19/2018 12:47:59 PMPPASS
BLD16-04488 BLD-Blower Door Test Results9/19/20189/19/20189/19/2018 12:47:51 PMPDONE
6ACH @50pa
BLD18-01669 BLD-Concrete9/19/20189/19/20189/19/2018 12:38:22 PMPPASS
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-01669 BLD-Energy code compliance9/19/20189/19/20189/19/2018 12:38:11 PMPPASS
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-01668 BLD-Concrete9/19/20189/19/20189/19/2018 12:37:47 PMPPASS
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-01668 BLD-Energy code compliance9/19/20189/19/20189/19/2018 12:37:30 PMPPASS
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-00355 BLD-Other9/18/20189/19/20189/19/2018 12:23:21 PMAPASS
block and tie // Randy Phone #: ###-####
BLD18-00352 BLD-Other9/18/20189/19/20189/19/2018 12:23:04 PMACANC
block and tie // Randy Phone #: ###-####
BLD18-01984 FIRE-Final Inspection9/18/20189/19/20189/19/2018 11:42:27 AMAPASS
Life safety Phone #: ###-#### Inspection requested via web by Frederick Sand
BLD18-02197 BLD-Final9/18/20189/19/20189/19/2018 11:01:47 AMPPASS
Matt Phone #: ###-####. ok for perm occ.
BLD18-02197 FIRE-Final Inspection9/18/20189/19/20189/19/2018 11:01:26 AMAPASS
Matt Phone #: ###-####
BLD18-01425 BLD-Concrete9/18/20189/19/20189/19/2018 10:33:09 AMAPASS
rebar- James Phone #: ###-####. Exterior footings for area A and interior column pad footings for area A on grid e and D.1 (first 4 only from south end).
BLD18-02530 FIRE-Final Inspection9/10/20189/19/20189/19/2018 9:40:37 AMACANC
Tami Lare Phone #: ###-####. Moved to pm.
BLD18-02249 BLD-Final9/17/20189/19/20189/19/2018 9:23:06 AMAFAIL
Back door will be unlocked Phone #: ###-#### Inspection requested via web by Jason Schultz. Provide tempered glass at window next to shower.
BLD18-02537 BLD-Footing9/18/20189/19/20189/19/2018 9:12:45 AMAPART
Terrie Phone #: ###-####
BLD18-02980 BLD-Final9/18/20189/19/20189/19/2018 8:55:47 AMADONE
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
BLD18-02980 DOC - Permit Finaled9/19/20189/19/20189/19/2018 8:55:34 AMPPASS
All work appeared to be done in accordance with local codes and ordiances.
BLD18-01730 BLD-Framing/Rough-in9/18/20189/19/20189/19/2018 8:55:01 AMACANC
Phone #: ###-#### Inspection requested via web by Mark Becker
BLD18-01730 BLD-Conference9/19/20189/19/20189/19/2018 8:54:55 AMADONE
Phone #: ###-#### Inspection requested via web by Mark Becker
BLD17-04447 BLD-Concrete9/18/20189/19/2018 A 
Hey Mike, we are placing a slab on grade tomorrow at 4am, strata will b onsite for rebar and concrete testing. You could look at our slab prep today if you come out for the grout placement Phone #: ###-#### >> Inspection requested via web by Jim Carriveau