ELE19-03092
| Conference | 9/19/2019 | 9/19/2019 | 9/19/2019 3:05:49 PM | P | PASS |
|
|
Floor sink in basement Phone #: ###-#### Inspection requested via web by Jim Williams Discussed floor drain being install above existing panels in basement, Contractor will stay away from being directly above panels....
|
ELE19-03279
| Electrical Rough-In | 9/17/2019 | 9/19/2019 | 9/19/2019 3:04:39 PM | P | PASS |
|
|
Pre-release inspection to reconnect power. Phone #: ###-#### Inspection requested via web by BRS Permitting p/s o/h rec ok
|
ELE19-03490
| Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 1:39:27 PM | P | PASS |
|
|
Call our office ###-#### to have someone meet you out there please. If you have any questions please feel free to contact Andrew ###-####. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Morgan MAin bath ok to cover
|
ELE19-01276
| Final | 9/19/2019 | 9/19/2019 | 9/19/2019 1:13:29 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Occ card not on site Final ok
|
ELE19-01987
| Electrical Rough-In | 9/17/2019 | 9/19/2019 | 9/19/2019 11:34:51 AM | A | PASS |
|
|
Contact Jason Thompson Phone #: ###-#### Inspection requested via web by Scott Campbell Entry hard lid@pony wall for reception desk, 2nd floor walls and bath hard lids ok to cover
|
ELE19-02904
| Final | 9/19/2019 | 9/19/2019 | 9/19/2019 10:54:17 AM | A | FAIL |
|
|
please call Jeremy Cloud Phone #: ###-#### Inspection requested via web by Kevin Perez AFC posted 8,862 No final until meter has been installed to verify circuits are energized
|
ELE19-03535
| Electrical Rough-In | 9/18/2019 | 9/19/2019 | 9/19/2019 10:37:47 AM | A | PASS |
|
|
Contact is Dan Grindell (###-####) Phone #: ###-#### Inspection requested via web by Steve McCloy U/G for site lighting around sub entrance ok to cover
|
ELE19-01615
| Electrical Rough-In | 9/18/2019 | 9/19/2019 | 9/19/2019 10:02:05 AM | A | PASS |
|
|
This is for a trench inspection Phone #: ###-#### Inspection requested via web by robert feller U/G feeds to new cafeteria ok to cover
|
ELE19-03497
| Rough-In Permanent Service | 9/18/2019 | 9/19/2019 | 9/19/2019 9:43:07 AM | A | PASS |
|
|
Please contact when done Phone #: ###-#### Inspection requested via web by Thomas wilson U/G to manu. home ok to cover p/s u/g rec ok
|
ELE19-03310
| Electrical Rough-In | 9/18/2019 | 9/19/2019 | 9/19/2019 9:24:30 AM | A | PASS |
|
|
Contact is Brian Prussia. Thanks! Phone #: ###-#### Inspection requested via web by BRS Permitting Verified U/L listing and scope of work on Solar ArRay install
|