PLM97-02799
| INSP - Sewer line FINAL | 8/29/1997 | 9/2/1997 | 9/2/1997 12:00:00 AM | A | PART |
|
|
09/02/97 347 - conference 347 25 MIN.
|
PLM97-02807
| INSP - Ground work | 9/2/1997 | 9/2/1997 | 9/2/1997 12:00:00 AM | P | PASS |
|
|
09/02/97 347 - FOR BATHROOM IN SHOP 347 20 MIN
|
PLM97-01612
| INSP - Final | 9/2/1997 | 9/2/1997 | 9/2/1997 12:00:00 AM | P | PASS |
|
|
DID YOU FINAL THIS 8/2797 STRUC. AND MEC. ALREADY FINALED OUT. IT HAS BEEEN CERTIFIED NOW IF YOU WANT TO GO BACK OUT.
|
PLM97-02650
| INSP - Water lines FINAL | 9/2/1997 | 9/2/1997 | 9/2/1997 12:00:00 AM | P | PASS |
|
|
09/02/97 347 - shows you finaled but he said you still needed to do the you inspected 8/19/97, 5 LINES 347 30 MIN
|
PLM97-02798
| INSP - Plumbing Rough-in | 8/29/1997 | 9/2/1997 | 8/31/1997 12:00:00 AM | A | PASS |
|
|
08/31/97 347 - basic 9 fixtures 347 25 MIN.
|